hiluxman
Well-known member
I don't do 10 hours.
Sod that. Don't get me wrong I do jobs after work if needed. But that's more a help someone out than been expected to and few and far between.
But as is well documented on here. My digger is tracking to the trailer at 3pm....usually its well before that time too. But it's nature of the beast, my work load is totally different to others on here.
Sometimes I'll do an early start to fetch x from the quarry to stockpile in the yard then go do the daily job. But I'd not do it the other way round.
I did the long days/doing days and nights many years ago. Its not for me.
However I'd still not do longer days to have a day off. 5 days at my pace plus the Saturday catch up is where I'm at.
Sod that. Don't get me wrong I do jobs after work if needed. But that's more a help someone out than been expected to and few and far between.
But as is well documented on here. My digger is tracking to the trailer at 3pm....usually its well before that time too. But it's nature of the beast, my work load is totally different to others on here.
Sometimes I'll do an early start to fetch x from the quarry to stockpile in the yard then go do the daily job. But I'd not do it the other way round.
I did the long days/doing days and nights many years ago. Its not for me.
However I'd still not do longer days to have a day off. 5 days at my pace plus the Saturday catch up is where I'm at.