doobin
Well-known member
My mistake. in my head i'm thinking 5ha total whereas obviously i asked for a time to do 1 hectare. sorry!0.25 acre x 10 days = 2.5 acres (which is just over 1 hectare). That’s very easily achievable, and should only require a single pass as a half decent operator should have time to keep the job and tip tidy and trim up etc whilst waiting for the dumper to return.
Worst case if they decide to have the tip further away just price in a second/third etc dumper. The only additional consideration then would be keeping the tip tidy if it is a long way from the dig.