The 'Today's Job' thread

Left hooker

Left hooker

Well-known member
This pipe for the closed loop drainage off the back of the treatment tanks or just a normal pipe run away to location of drainage field šŸ¤”
 
Giles

Giles

Well-known member
You can’t beat a proper pipe laying bucket for that kind of job. Saves a fortune in stone. Got one here on 30mm pins, 125 centres if that’s any use? Distance a killer though I’m Sussex. View attachment 44350
I’ve got similar on 3 but don’t use on foul or top only on water mains or landdrains not enough room to get in trench do joints check falls etc
 
6

6feetdown

Well-known member
Constant running water, working on top of river bank, sceptic tank to the left, tree in front, pipes and French drains running alongside, it's been challenging!
Mini coffer dam to concrete the pump base


20230221_100839.jpg
20230221_105428.jpg
20230222_085439.jpg
20230222_105604.jpg
20230222_105609.jpg
20230222_113148.jpg
20230222_164004.jpg
 
Last edited:
S

Smiffy

Well-known member
I’ve got similar on 3 but don’t use on foul or top only on water mains or landdrains not enough room to get in trench do joints check falls etc

To do joints use a piece of blue rope under the pipe and hold both ends and lower it down. Then use a long handled graft to lever them together.
To check falls either a laser level or spirit level on a bit of string. And to level shingle a tarmac rake cut down to 120mm wide.
Can do the whole lot without climbing in and out of the trench and getting muddy.
 
Giles

Giles

Well-known member
To do joints use a piece of blue rope under the pipe and hold both ends and lower it down. Then use a long handled graft to lever them together.
To check falls either a laser level or spirit level on a bit of string. And to level shingle a tarmac rake cut down to 120mm wide.
Can do the whole lot without climbing in and out of the trench and getting muddy.
Just a load of added faf

Priced at Ā£45/m for upto 1m deep and 110mm etc why add all that complication stone priced in already. I mainly use 12ā€ clay spade or 450mm smooth if going deeper or 2 pipes in run

Ad400 just overnight to keep them connected till we did next run following day to treatment plant
 

Attachments

  • FA8E117B-0A5A-4F86-96B6-A30289A1A9F3.jpeg
    FA8E117B-0A5A-4F86-96B6-A30289A1A9F3.jpeg
    427.5 KB · Views: 196
  • A581DF8C-FC81-4918-89CA-9A54720E5507.jpeg
    A581DF8C-FC81-4918-89CA-9A54720E5507.jpeg
    426.6 KB · Views: 196
D

DaveDCB

Well-known member
It never hurts to have some extra space in a trench when doing drainage, you can bugger around for hours shaving bits of the side of a trench etc when you can just dig abit wider and have room to move pipes around etc. Most of what I do is like Giles pictured above, nothing ever goes exactly to plan šŸ˜‚
 
S

Smiffy

Well-known member
Just a load of added faf

Priced at Ā£45/m for upto 1m deep and 110mm etc why add all that complication stone priced in already. I mainly use 12ā€ clay spade or 450mm smooth if going deeper or 2 pipes in run

Ad400 just overnight to keep them connected till we did next run following day to treatment plant

It doesn't actually take any longer or more effort. Infact it's often quicker than scrabbling in and out of a muddy trench +keeps you clean
Just a different way of working.
 
Giles

Giles

Well-known member
Finished off drains job this am then bit of thinking Rd the problem getting old paving out the hole. My hoist wasn’t happy bunny, remote full of rusty water so hired this for Ā£80 for day worked a treat

 

Attachments

  • 4C2AC141-9A5D-4D49-849B-E2D5AC38421F.jpeg
    4C2AC141-9A5D-4D49-849B-E2D5AC38421F.jpeg
    144.3 KB · Views: 157
  • 2C1FFCBE-97C7-4C84-AD77-DE01F2C9C8D6.jpeg
    2C1FFCBE-97C7-4C84-AD77-DE01F2C9C8D6.jpeg
    352.8 KB · Views: 151
  • 455F4C17-381D-4C00-9BAD-B1439328FEBF.jpeg
    455F4C17-381D-4C00-9BAD-B1439328FEBF.jpeg
    398.4 KB · Views: 154
  • 4EA4D97C-6AEA-4CC3-88E4-7A1E5F446543.jpeg
    4EA4D97C-6AEA-4CC3-88E4-7A1E5F446543.jpeg
    433.1 KB · Views: 138
  • 129D74F6-01F1-47A3-AC65-15F94CC0496C.jpeg
    129D74F6-01F1-47A3-AC65-15F94CC0496C.jpeg
    388 KB · Views: 155
  • 646F7234-EDF3-41A1-82B1-132158AAD8EA.jpeg
    646F7234-EDF3-41A1-82B1-132158AAD8EA.jpeg
    422.8 KB · Views: 136
  • 33722CB5-6B60-4B1D-8F22-49ABA349A461.jpeg
    33722CB5-6B60-4B1D-8F22-49ABA349A461.jpeg
    265.4 KB · Views: 111
  • CFC780CF-4B75-4026-9736-A516F426D84D.jpeg
    CFC780CF-4B75-4026-9736-A516F426D84D.jpeg
    410.8 KB · Views: 131
  • 4573DF69-3086-43F9-9FA9-804E61EF246D.jpeg
    4573DF69-3086-43F9-9FA9-804E61EF246D.jpeg
    364.9 KB · Views: 146
  • 402539C5-7C52-4850-ABB3-F4013817D32A.jpeg
    402539C5-7C52-4850-ABB3-F4013817D32A.jpeg
    200.7 KB · Views: 162
maz

maz

Well-known member
Had 2 pigs to process on the farm yesterday. The 803 was a godsend, took the bucket off and attached a gambrel for lifting them up, in and out of the scalding tank, scraping hair off and then positioning lower for gutting and halfing, then trundled off to the cooler box. I dunno how anyone does it without a digger! Bloody versatile machines :) I’d post pics but don’t wanna ruin anyones fry up.
 
Top