9 t wide tracks

V8Druid

V8Druid

do it as well as you can,but learn to do it better
My 5.5 ton is lighter obviously but on its 550mm steels it literally floats teamed up to our 5 ton yanmar tracked dumper you can be on stuff you can’t walk on.

Saw this thought of you for cutting tracks down

16 ton is on 800s and that does pretty well on the soft stuff but does sink on seriously wet stuff
flip flop brigade ???
 
doobin

doobin

Well-known member
I'd be doing something like this 🤔
The machine is a keeper, the JCB design is not at all elegant, and ideally you want even tracks with no restriction on the functionality of the blade 😀
Once I’ve removed these rams I’ll have a measure and see what we would need to replicate the same range of movement from those points. My gut feeling is you’d need a telescopic ram as the distance is so short.

There’s a possibility I might be able to get away with the original rams turned around and minus the guards also.

For now, the priority is to get it onto steel tracks for this season so I think a pair of chain binders is the cheapest route
 
D

DaveDCB

Well-known member
Once I’ve removed these rams I’ll have a measure and see what we would need to replicate the same range of movement from those points. My gut feeling is you’d need a telescopic ram as the distance is so short.

There’s a possibility I might be able to get away with the original rams turned around and minus the guards also.

For now, the priority is to get it onto steel tracks for this season so I think a pair of chain binders is the cheapest route
So I’ve had a good look at the 86c spec, and there is no mention of not being able to spec a tilt blade with 600 pads.. (I appreciate you physically can’t) I wonder if JCB have an alternative blade configuration? Normally they’d say on the spec if you can’t have one option with another. Or just computer says no when you try and order them together I guess.

Id go for keeping it simple like you say, standard 600’s and chain the blade up - I’d always loose the angle blade over not sinking!
 
S

Smiffy

Well-known member
Once I’ve removed these rams I’ll have a measure and see what we would need to replicate the same range of movement from those points. My gut feeling is you’d need a telescopic ram as the distance is so short.

There’s a possibility I might be able to get away with the original rams turned around and minus the guards also.

For now, the priority is to get it onto steel tracks for this season so I think a pair of chain binders is the cheapest route


Long term solution, rather than have the rams at angles. Could you plasma cut a hole through the front face of the frame. And weld a tube in and the cylinder pass through the tube and onto the other side of the frame. If you had one cylinder each side they would only need to be single acting and you could mount them so the cylinder runs through the hole and the rod stays static to reduce the chance of damage.
 
doobin

doobin

Well-known member
Do you use the blade that much? I’ve only ever used them to clean up against or level up or sometimes push a pile back up never to cut a road box etc.
Yes and no. Originally I thought it wasnt much use as only 4 way. But it's handy to cast material to one side as you go sometimes.
 
doobin

doobin

Well-known member
A lot of full lgp or peat spec loose the blade for track width and because they become anchors when you sink
Yes, I’m not working on that soft ground. Heathland is very soft sand which lets you sink just enough that it’s constantly annoying on 450 rubbers, but there’s no way you could ever get a machine physically trapped in it.

A couple of feet down is the ironstone sand layer which is much harder.
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better
Just been showed a pic of a lad up here on the moors by his mate...just fitted 1000mm tracks! Taken blade off tho...
how does he cope with the turret ?
 
Giles

Giles

Well-known member
recently lost out on some wetland creation work for the trust to these lot who have this setup, they do a lot of the 'moors for the future' gravy train work! cash power hose ive heard, spend about 3m a year on the moors.

me and another lad where around 17k these lads in at 13k was over 4k of stone for gully blocking and 2 weeks of machine and track dumper work!
 

Attachments

  • 4f4fa8_6ae983618bef4426a6661589d3006e22~mv2_d_4096_3072_s_4_2.jpg
    4f4fa8_6ae983618bef4426a6661589d3006e22~mv2_d_4096_3072_s_4_2.jpg
    241.9 KB · Views: 157
V8Druid

V8Druid

do it as well as you can,but learn to do it better
recently lost out on some wetland creation work for the trust to these lot who have this setup, they do a lot of the 'moors for the future' gravy train work! cash power hose ive heard, spend about 3m a year on the moors.

me and another lad where around 17k these lads in at 13k was over 4k of stone for gully blocking and 2 weeks of machine and track dumper work!
turret extension on there BTLs
 
B

bobthebuilder

Well-known member
recently lost out on some wetland creation work for the trust to these lot who have this setup, they do a lot of the 'moors for the future' gravy train work! cash power hose ive heard, spend about 3m a year on the moors.

me and another lad where around 17k these lads in at 13k was over 4k of stone for gully blocking and 2 weeks of machine and track dumper work!
So 9 grand for a fortnights digger and dumper work ? Ami reading that right .or have they bought the work to get in a such ?
 
Giles

Giles

Well-known member
So 9 grand for a fortnights digger and dumper work ? Ami reading that right .or have they bought the work to get in a such ?
well 2 weeks always becomes 3 and they're are restriction on working in the wet etc even with lgp tracks

2 guys 8 ton and track dumper is 1k a day so 15 days 15k so they bought it or they're margins are low/lower

fair bit to shift to block drains and channels won from scrape out ponds 190m3 of stuff to relocate 50-100m at a time
 
doobin

doobin

Well-known member
So 9 grand for a fortnights digger and dumper work ? Ami reading that right .or have they bought the work to get in a such ?

well 2 weeks always becomes 3 and they're are restriction on working in the wet etc even with lgp tracks

2 guys 8 ton and track dumper is 1k a day so 15 days 15k so they bought it or they're margins are low/lower

fair bit to shift to block drains and channels won from scrape out ponds 190m3 of stuff to relocate 50-100m at a time
No tilty on that digger, that’s how they are so cheap! 🤣
 
Giles

Giles

Well-known member
No tilty on that digger, that’s how they are so cheap! 🤣
ex senior ranger so well known, runs a fews bcs tractors etc doing conservation works and has a river of moors money pouring in, trust want me to get involved in peat work so their are more contractors even putting me in touch with favorable finance brokers etc but not something I want to be doing at the moment with young kids. sat on a moorland hours away from a road etc, plus its not just a wide track machine you need support equipment for fuel and stuff to dam up waterways and transport to it etc taking my quad with me each day etc or argot cat
 
Giles

Giles

Well-known member
Happened to be looking at a job where it’s parked
 

Attachments

  • IMG_3390.jpeg
    IMG_3390.jpeg
    219.6 KB · Views: 120
  • 0FD09198-FDE6-491B-8840-164217BA25A0.jpeg
    0FD09198-FDE6-491B-8840-164217BA25A0.jpeg
    119.2 KB · Views: 136
  • IMG_3381.jpeg
    IMG_3381.jpeg
    183.4 KB · Views: 112
  • IMG_3385.jpeg
    IMG_3385.jpeg
    221.5 KB · Views: 123
Top