Do you think tyres are better than tracks for garden stuff?
Yes x100. It’s all about quick repeated cycles. I piled up a load then got on with ripping out the stumps whilst the Sherpa driver self loaded, ran it up the ramps and out of the garden and made a first class pile on the boards with minimal overspill. Both him and me were flat out, neither having to wait for the other. A tracked loader would be too slow, would rip the slabs up when turning (dodgy patio) and shake the operator to bits. I can’t see the point in them for domestic jobs like this.
Strikes me you’re getting your money’s worth out of it.
not half. Those trees plus stumps and dig out was £2800 plus vat. Two days two men, £2100 plus vat left after wages, grab lorry and fuel. She does like a drink though- 15 litres a day if you’re pushing it hard.