Thomas7740
Well-known member
Changed phone so no pictures from before March. Started a site in Jan and was back in April to do subfloors and start drainage. The site is part of a bigger site that was never finished, heres the tails for the foul and storm that had been left by previous developer. Had been backfilled with 4inch crusher run, no pipe bedding. Cut back, filed them and connected in the manholes.