Mulholland plant hire (northern Ireland)

J

Jimoz

Well-known member
I don't think I have ever seen drawings that haven't had steps and thickenings and widenings. Fairly standard to have window sampling or plate bearing tests or even just trial holes dug before a foundation design. Plus plate bearing tests and engineers design for the crane pad to lift the timber frame in.
Im guessing your work is bigger sites or more expensive builds than I'm used to?!
 
S

Smiffy

Well-known member
Im guessing your work is bigger sites or more expensive builds than I'm used to?!

Not when I was doing house building work.
It was small developments from 1-5houses. With plot values from £350k - £1.2m
So real variety of stuff.
It was the crane companies asking for the crane pads being designed aswell.
And if you get into temporary works stuff then it's quite plane that you have to have an engineers design
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better
I don't think I have ever seen drawings that haven't had steps and thickenings and widenings. Fairly standard to have window sampling or plate bearing tests or even just trial holes dug before a foundation design. Plus plate bearing tests and engineers design for the crane pad to lift the timber frame in.
crane pad!!! .. could only ever dream of one of those on a site :rolleyes:
 
groundworker

groundworker

Well-known member
Not when I was doing house building work.
It was small developments from 1-5houses. With plot values from £350k - £1.2m
So real variety of stuff.
It was the crane companies asking for the crane pads being designed aswell.
And if you get into temporary works stuff then it's quite plane that you have to have an engineers design
Those are massive jobs by my standards! Big enough to pay for proper designs anyway

I've poured loads of foundations with no details at all, doing basic extensions usually with just a plan drawing.

It used to be that every council had their own rules based on local ground conditions, usually 1m - 1.2 deep, 450 wide single storey, 600 double. All sorted verbally with BC.

Quite rare to find that now though
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better
Seen a photo yesterday in Scandinavia crane leg went through an underground tank!
my last year in school, Celtic cranes had 1564 Grove in the grounds moving some portaclassrooms ... put a leg straight through the boiler room ducting carrying all the hot water piping to the main building .... was lucky he'd just taken the bite and cabin just sat back on its pads --- change of underwear moment for the op. though :ROFLMAO::ROFLMAO:
 
6

6feetdown

Well-known member
my last year in school, Celtic cranes had 1564 Grove in the grounds moving some portaclassrooms ... put a leg straight through the boiler room ducting carrying all the hot water piping to the main building .... was lucky he'd just taken the bite and cabin just sat back on its pads --- change of underwear moment for the op. though :ROFLMAO::ROFLMAO:
Above ended up horizontal
 
Top