Stubota86
Well-known member
i would think just a strip found so may not be to bad to break out just back fill the area you need to start on and so no straddling trenches and break out and dig down to the new level as you go if the first builder was too tight to dig to correct (minimum 1 m deep subject to building control )in the first place the concrete may not be the best any way
very true
I was chatting to an inspector once who looked at a dig, signed it off and left. Realised he’d forgotten something so popped back and found them mixing up ballast and cement in the trenches. Made them bucket it all out and stayed there all day whilst they did it properly