Few from last week. Had Al Wallace’s excellent team in for a road closure job. Lovely bit of kit, really makes life easy. Bit of bracken control, some more trees, and tested the Blec grader box out on bracken litter which worked wonderfully. Holds about a 13t bucket full, then run it to the bund, place it where you want and compact with the wheels like your on a silage clamp. Very efficient.

Both the Kubota and the Carraro proving their worth this week, and the Multione invaluable as always.

And went to look at the jcb but you all know that already.
View attachment 64392View attachment 64393View attachment 64394View attachment 64395View attachment 64396View attachment 64397View attachment 64398View attachment 64399View attachment 64400View attachment 64402View attachment 64403View attachment 64401View attachment 64404
Is that Multi scraper the one with a barrel type blade that curls hydraulically ?Missed one locally for peanuts the other day.
 
S

Stroppymonkey

Well-known member

Attachments

  • IMG_1726.png
    IMG_1726.png
    815.8 KB · Views: 151
TiltyShaun

TiltyShaun

Well-known member
Not posted anything lately but been beavering away on a site for 10 new dwellings with the 8 ton kobelco. Been digging a hole for an attenuation tank. 27.5m long x 11.50m wide and around 1.2m deep. Spoil going into a 6 ton dumper and moved about 50m. Hard clay. It has taken me by surprise as to how long it has taken.
Any guesses to upset me?!
 

Attachments

  • 229E3A05-CC1D-4967-B14D-CD9B96409266.jpeg
    229E3A05-CC1D-4967-B14D-CD9B96409266.jpeg
    330.7 KB · Views: 154
Storrsy

Storrsy

Well-known member
Not posted anything lately but been beavering away on a site for 10 new dwellings with the 8 ton kobelco. Been digging a hole for an attenuation tank. 27.5m long x 11.50m wide and around 1.2m deep. Spoil going into a 6 ton dumper and moved about 50m. Hard clay. It has taken me by surprise as to how long it has taken.
Any guesses to upset me?!
On your own hopping between dumper and digger I'd say 6 or 7 days
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better
Not posted anything lately but been beavering away on a site for 10 new dwellings with the 8 ton kobelco. Been digging a hole for an attenuation tank. 27.5m long x 11.50m wide and around 1.2m deep. Spoil going into a 6 ton dumper and moved about 50m. Hard clay. It has taken me by surprise as to how long it has taken.
Any guesses to upset me?!
that is a LOT of spoil ... how many dumper loads .... took 600+ out of mine and they were well loaded
 