Conor
Well-known member
It is crazy, and what's more almost all the material is on site to finish the building. There is a huge amount of the material being salvaged and sold on but still hugely wasteful. It boils down to the developer realising the land is now more valuable as residential as it is a prime location.How can you spend £££ building somthing, stop, then demolish it, such a waste of materials. Let alone the time/effort in doing it.
I'm far far from green but things like that is a total waste.
As for Neom, that's in Saudi not Dubai but its typical of how things are done in the region. They hire the best people use the best materials, they will finish some of it, some will be stopped halfway through and left to rot and some the plans will be changed halfway through and redone at great cost but that's OK because they have the money !