JD450A
Feral as Fk 🐾
I'm surprised that someone from the DNO has approved it as a method tbh.Yeah , at least the lines were dead. But still two blokes up the pole while they lifted it on!
I'm surprised that someone from the DNO has approved it as a method tbh.Yeah , at least the lines were dead. But still two blokes up the pole while they lifted it on!
It’s SPEN, and Emerald do a lot for them.I'm surprised that someone from the DNO has approved it as a method tbh.
Yeah they ain’t a fly by night company! Main contractor for SP energy in this area, did a good job. No problems etc. nothing unsafe from what I saw, and as I mentioned lines were off anyway.It’s SPEN, and Emerald do a lot for them.
We used to do loads of work for SPEN and the auditing was incessant (which is fair enough).
I would imagine all of the kit on site is totally above board, and the working practices agreed (though pole climbing will be a no-no if you can do the job from a basket).
There are times when a MEWP gets in the way though (if you need the machine to lift the transformer up there may be no room for a MEWP as well for example).
is that a T650 I spy?Rearranged the shed and made room for more machines. Used to have cement at the back but it made no sense as was a pain to get to.
Now I can have the alpine with dual wheels and implement in the other shed (and spare room for something else).
I’m pretty sure I’ve left a good long narrow space sufficient for the cherry picker but won’t know till it comes back. Kit at the back of the shed is rarely used so I don’t mind it being tucked away like it is. First time the tracked dumper has spend a night inside in six years!
Very satisfying. View attachment 80142
I wish. 450.is that a T650 I spy?
What’s on the front?I wish. 450.
Get a bigger shed.No
Nothing, otherwise it doesn’t fit![]()
Should have said this before, but - welcome to the rabbit hole.I love it
WHat mewp have you bought?Know that feeling.
Got the access platform, 015, 108, two track barrows and ride on mower inside today.... Need to tidy up some more as I want to get the Hinowa forklift, another 108 and the 219 in the same shed.
Looks like youve got decent weather as well. Beautiful todayTidying away rocks left over from a project back in Jan. Tb290-2, still weak on the tracking but otherwise lovely machine.
Yes first dry looking week since God knows when! Probably last October I reckonLooks like youve got decent weather as well. Beautiful today
Heck, what's the story behind that then- wouldn't it have been easier to do the clearance before the scaffolding went upView attachment 80194
Had to fly a couple of chippers into a nest of scaffolding and general doom this morning - should keep the lads entertained for a few days!…
looks like it's the scaff that needs rescuingHeck, what's the story behind that then- wouldn't it have been easier to do the clearance before the scaffolding went up![]()
It’s a long-derelict burned out grade 2 listed railway warehouse that needs a new roof and a bit of pointing.Heck, what's the story behind that then- wouldn't it have been easier to do the clearance before the scaffolding went up![]()
That looks an utter nightmare. Hope you've plenty of spare chainsIt’s a long-derelict burned out grade 2 listed railway warehouse that needs a new roof and a bit of pointing.View attachment 80197View attachment 80195
So someone has plans for it then?It’s a long-derelict burned out grade 2 listed railway warehouse that needs a new roof and a bit of pointing.View attachment 80197View attachment 80195
It’ll be redeveloped - for now they need to be able to survey it properly.So someone has plans for it then?