Furniss
Well-known member
It looks entirely and very french.
It looks entirely and very french.
Baguette measuring device? Big hole just right.. small hole send it back for more baking!It looks entirely and very french.
that is so bang onstumbled across this again and reminded me how true it is
very late !!Working late here
Looks like a job for a small tracked loader.our current fun job is trying to make this safe, its a historic national monument an adit from an old lead mine, basically the drain where they chucked all the tailings out, but water been washing the base away for god knows how long so we are trying to sort it as usually with no budget either. told them it could be 250k + but we've got 20k to bandaid it
everything via 1m wide footpath
the dx10 has impressed with picking some monster stones up (yes I help with my bulk as counter weight lol) some sketchy getting them in to the dumper only just. the jb grab doing good but foot pedal takes a bit of getting used to as open is near me so keep resting my foot on it and opening which is safer when swinging 300-500kg lumps
the two biggest lumps took a few goes and had to have them right in close and dumper tipped up but got them in
using 1.6 ton to place them with finger grapple but got a head for the Kubota for the jb but unless I bring 3 or 5 at top to load need the jb on the micro loading at the top
Looks like a job for a small tracked loader.
Versatile are doing hire on the small Bobcat tracked skids. Could just leave a bloke on that all day.Yeah that would be nice but don’t have one,
making it work with what we've got doubt it'd be much quicker with an expensive rented loaderVersatile are doing hire on the small Bobcat tracked skids. Could just leave a bloke on that all day.
Blocking it up or just stopping slips?our current fun job is trying to make this safe, its a historic national monument an adit from an old lead mine, basically the drain where they chucked all the tailings out, but water been washing the base away for god knows how long so we are trying to sort it as usually with no budget either. told them it could be 250k + but we've got 20k to bandaid it
everything via 1m wide footpath
the dx10 has impressed with picking some monster stones up (yes I help with my bulk as counter weight lol) some sketchy getting them in to the dumper only just. the jb grab doing good but foot pedal takes a bit of getting used to as open is near me so keep resting my foot on it and opening which is safer when swinging 300-500kg lumps
the two biggest lumps took a few goes and had to have them right in close and dumper tipped up but got them in
using 1.6 ton to place them with finger grapple but got a head for the Kubota for the jb but unless I bring 3 or 5 at top to load need the jb on the micro loading at the top
Blocking it up or just stopping slips?
Bet mine explorers have been keeping an eye on you![]()
Nice job in nice locationRepairing the stonework each side of it, there’s a more accessible bit other side the road this really is only a drain culvert. No actually clear entrance way etc
Trying to work out how to get the 5 ton in for more reach and safety
Some do, some don’t. Undo it and have a look. You haven’t missed an in-line filter, have you, or the pick up strainer in the tank?View attachment 65270
Digger kept having a hunt for diesel every so often again despite new filters ...is there likely to be a filter in this banjo setup ?
Certainly an interesting job!our current fun job is trying to make this safe, its a historic national monument an adit from an old lead mine, basically the drain where they chucked all the tailings out, but water been washing the base away for god knows how long so we are trying to sort it as usually with no budget either. told them it could be 250k + but we've got 20k to bandaid it
everything via 1m wide footpath
the dx10 has impressed with picking some monster stones up (yes I help with my bulk as counter weight lol) some sketchy getting them in to the dumper only just. the jb grab doing good but foot pedal takes a bit of getting used to as open is near me so keep resting my foot on it and opening which is safer when swinging 300-500kg lumps
the two biggest lumps took a few goes and had to have them right in close and dumper tipped up but got them in
using 1.6 ton to place them with finger grapple but got a head for the Kubota for the jb but unless I bring 3 or 5 at top to load need the jb on the micro loading at the top