The 'Today's Job' thread

Giles

Giles

Well-known member
stumbled across this again and reminded me how true it is
 

Attachments

  • contractors.JPG
    contractors.JPG
    116.1 KB · Views: 180
6

6feetdown

Well-known member
Working late here
 

Attachments

  • 20241003_220622.jpg
    20241003_220622.jpg
    148.7 KB · Views: 165
Giles

Giles

Well-known member
our current fun job is trying to make this safe, its a historic national monument an adit from an old lead mine, basically the drain where they chucked all the tailings out, but water been washing the base away for god knows how long so we are trying to sort it as usually with no budget either. told them it could be 250k + but we've got 20k to bandaid it

everything via 1m wide footpath

the dx10 has impressed with picking some monster stones up (yes I help with my bulk as counter weight lol) some sketchy getting them in to the dumper only just. the jb grab doing good but foot pedal takes a bit of getting used to as open is near me so keep resting my foot on it and opening which is safer when swinging 300-500kg lumps

the two biggest lumps took a few goes and had to have them right in close and dumper tipped up but got them in

using 1.6 ton to place them with finger grapple but got a head for the Kubota for the jb but unless I bring 3 or 5 at top to load need the jb on the micro loading at the top
 

Attachments

  • image0.JPEG
    image0.JPEG
    152.8 KB · Views: 122
  • image3.JPEG
    image3.JPEG
    90.4 KB · Views: 105
  • IMG_3742.jpg
    IMG_3742.jpg
    190.1 KB · Views: 98
  • IMG_3745.jpg
    IMG_3745.jpg
    92.6 KB · Views: 97
  • IMG_3747.jpg
    IMG_3747.jpg
    133.3 KB · Views: 97
  • IMG_3751.jpg
    IMG_3751.jpg
    220.3 KB · Views: 101
  • IMG_3772.jpg
    IMG_3772.jpg
    82.1 KB · Views: 106
  • IMG_3776.jpg
    IMG_3776.jpg
    144.4 KB · Views: 97
  • IMG_3777.jpg
    IMG_3777.jpg
    93 KB · Views: 101
  • IMG_3778.jpg
    IMG_3778.jpg
    97.4 KB · Views: 107
  • IMG_3779.jpg
    IMG_3779.jpg
    94.1 KB · Views: 106
  • IMG_3785.jpg
    IMG_3785.jpg
    232.3 KB · Views: 103
doobin

doobin

Well-known member
our current fun job is trying to make this safe, its a historic national monument an adit from an old lead mine, basically the drain where they chucked all the tailings out, but water been washing the base away for god knows how long so we are trying to sort it as usually with no budget either. told them it could be 250k + but we've got 20k to bandaid it

everything via 1m wide footpath

the dx10 has impressed with picking some monster stones up (yes I help with my bulk as counter weight lol) some sketchy getting them in to the dumper only just. the jb grab doing good but foot pedal takes a bit of getting used to as open is near me so keep resting my foot on it and opening which is safer when swinging 300-500kg lumps

the two biggest lumps took a few goes and had to have them right in close and dumper tipped up but got them in

using 1.6 ton to place them with finger grapple but got a head for the Kubota for the jb but unless I bring 3 or 5 at top to load need the jb on the micro loading at the top
Looks like a job for a small tracked loader.
 
Lancs Lad

Lancs Lad

Well-known member
our current fun job is trying to make this safe, its a historic national monument an adit from an old lead mine, basically the drain where they chucked all the tailings out, but water been washing the base away for god knows how long so we are trying to sort it as usually with no budget either. told them it could be 250k + but we've got 20k to bandaid it

everything via 1m wide footpath

the dx10 has impressed with picking some monster stones up (yes I help with my bulk as counter weight lol) some sketchy getting them in to the dumper only just. the jb grab doing good but foot pedal takes a bit of getting used to as open is near me so keep resting my foot on it and opening which is safer when swinging 300-500kg lumps

the two biggest lumps took a few goes and had to have them right in close and dumper tipped up but got them in

using 1.6 ton to place them with finger grapple but got a head for the Kubota for the jb but unless I bring 3 or 5 at top to load need the jb on the micro loading at the top
Blocking it up or just stopping slips?
Bet mine explorers have been keeping an eye on you 👀
 
Giles

Giles

Well-known member
Blocking it up or just stopping slips?
Bet mine explorers have been keeping an eye on you 👀

Repairing the stonework each side of it, there’s a more accessible bit other side the road this really is only a drain culvert. No actually clear entrance way etc

Trying to work out how to get the 5 ton in for more reach and safety
 
Lancs Lad

Lancs Lad

Well-known member
Repairing the stonework each side of it, there’s a more accessible bit other side the road this really is only a drain culvert. No actually clear entrance way etc

Trying to work out how to get the 5 ton in for more reach and safety
Nice job in nice location 👍
 
Furniss

Furniss

Well-known member
1000019558.jpg

Digger kept having a hunt for diesel every so often again despite new filters ...is there likely to be a filter in this banjo setup ?
 

Attachments

  • 1000019559.jpg
    1000019559.jpg
    160.1 KB · Views: 93
Furniss

Furniss

Well-known member
Not missed a filter but will check the banjo and if not the strainer, run it really low the other day.
 
Storrsy

Storrsy

Well-known member
our current fun job is trying to make this safe, its a historic national monument an adit from an old lead mine, basically the drain where they chucked all the tailings out, but water been washing the base away for god knows how long so we are trying to sort it as usually with no budget either. told them it could be 250k + but we've got 20k to bandaid it

everything via 1m wide footpath

the dx10 has impressed with picking some monster stones up (yes I help with my bulk as counter weight lol) some sketchy getting them in to the dumper only just. the jb grab doing good but foot pedal takes a bit of getting used to as open is near me so keep resting my foot on it and opening which is safer when swinging 300-500kg lumps

the two biggest lumps took a few goes and had to have them right in close and dumper tipped up but got them in

using 1.6 ton to place them with finger grapple but got a head for the Kubota for the jb but unless I bring 3 or 5 at top to load need the jb on the micro loading at the top
Certainly an interesting job!
 
Top