The 'Today's Job' thread

6

6feetdown

Well-known member
some nice lengths of 8" channel there ... I'd try and keep them in length if I could
what're you going to use for the cold cuts?
Salvaged about 50 lengths of 8x2 treated and steels being kept at moment cut for transporting.
Recip saw with hilti blade for cuts
 

Attachments

  • 20240128_145758.jpg
    20240128_145758.jpg
    145.6 KB · Views: 194
  • 20240128_174715.jpg
    20240128_174715.jpg
    155.3 KB · Views: 139
6

6feetdown

Well-known member
I’d bend them in half with no hot works 🫣😂
Or I did spy a big tracked machine in the background dismantling planes, I assume they have a shear on them? £20 gets you a fair favour on a lunch break 😉
Yeah they've been flat out dismantling all weekend still there when we left think have wagons due tomorrow.
 
doobin

doobin

Well-known member
Who can guess how much Multione want for each of these wear studs for the sliding boom? 16 required…
IMG_3761.jpeg
 
S

Stroppymonkey

Well-known member
A fine day out in Devon drizzle chasing water leaks on an old 70s alkathene supply. Maybe if the installer hadn't backfilled original trench with building rubble it wouldn't have split in the first place! Glad to get this one finished as been putting it off since before Xmas. Think we found 3 x BT, 2 x Fibre , 2 separate water supplies, 3 armoured cables and the 6inch water main and a fire hydrant and plastic to copper joints all in the first pit. Our supply was MDPE converting to copper running over the water main and then under the hydrant before converting to Alkathene somewhere. Bloody Nightmare. Not a bit of marker tape or pipe bedding or sand anywhere, all clay and stones the size of blocks. Nothing got struck which was a testimonial to the lads very patient digging. Customer was a proper watcher as well. Kept having to tell him to keep away as trying to get IN the tench with us. Grrr.
 

Attachments

  • 20240202_110536.jpg
    20240202_110536.jpg
    335.1 KB · Views: 133
V8Druid

V8Druid

do it as well as you can,but learn to do it better
Who can guess how much Multione want for each of these wear studs for the sliding boom? 16 required…View attachment 57243
either going to be a few finger nail clippings ...... or a handful of fingers .... not big enough to warrant an arm, let alone a leg too
 
doobin

doobin

Well-known member
Could be either end of the spectrum…£10 or £60 each?
£24 each. So £384 for all 16. Which seemed fking steep, so I dug out a rod of oilon and made them for £35 and an hour on the lathe.

Should be a better job than whatever plastic they use- just looks like nylon. I also took the grease nipple out so you can fit the waxoyl chassis hose inside the boom to properly lubricate it.
IMG_3759.jpeg
IMG_3762.jpeg
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better
didn't realise they were that small :oops:o_O .. was guessing on circa 100mm dia.:unsure: ..... love your solution to the issue though:love::cool: ... man after my own heart(y) ..... "don't take the p*ss with spares prices":mad: ... especially with a few pieces of crappy placcy :mad: :mad:
 
Top