The 'Today's Job' thread

Giles

Giles

Well-known member
Little extension dig out today about 100 ton to come out due to height, into 1 ton dumper and onto front but up a narrow lane so actually getting rid of it is yet to be solved. @hiluxman might be coming to save me with is wagon lol. If not try get tractor and trailer in.
 

Attachments

  • 40CC2FFF-F3C4-4312-BF8F-A96435702EA3.jpeg
    40CC2FFF-F3C4-4312-BF8F-A96435702EA3.jpeg
    367.4 KB · Views: 208
  • 3E5274C3-A108-48E2-B519-D0AD78FA5FBA.jpeg
    3E5274C3-A108-48E2-B519-D0AD78FA5FBA.jpeg
    419.4 KB · Views: 140
  • C954B24F-9926-4B54-AFFE-BA869FD91F1A.jpeg
    C954B24F-9926-4B54-AFFE-BA869FD91F1A.jpeg
    323.3 KB · Views: 177
6

6feetdown

Well-known member
It really depends what your doing with it. I have 75mm but tbh if it's dry enough to not clog up I'd prefer 50mm as it's surprising what size rocks still gets through 75mm. But if raking root matter etc 75mm is fine
Amazes me even with 50 what gets through i might put an extra bar across the middle of ours at some point
 
groundworker

groundworker

Well-known member
50mm on my 1.5/3 ton one 75mm on my 5 ton one
Mine is 50mm on the 1.5 ton, best use for it I have found is breaking out an old slab. Pull out the big lumps and leave something resembling type 1 behind.

With 75mm gaps it would be more like 6F2 which is hard work with a small machine/thin build up.
 
Top