Unless to nip the jaws in for smaller size it means the bigger stuff won't go in I'm not sure crushing twice to get down to the size you want is anything other than a good way to burn more fuel and time.
I've tried both ways with crusher bucket and going straight down to size you want works out quicker.
 
TiltyShaun

TiltyShaun

Well-known member
Unless to nip the jaws in for smaller size it means the bigger stuff won't go in I'm not sure crushing twice to get down to the size you want is anything other than a good way to burn more fuel and time.
I've tried both ways with crusher bucket and going straight down to size you want works out quicker.
The man who does my crushing usually runs it through twice if I want 40mm down. He pays for the fuel in the crusher so I guess he does do it for fun.
 
TiltyShaun

TiltyShaun

Well-known member
I have just remembered what he said. If you run it through twice it only crushes what is bigger than 40mm. The rest falls through. If you crush it down to 40mm at the start it slows the output. So chuck it all through at 100mm then chuck it all through again at 40mm. I guess it also depends on material and the crusher.
 
GazCro

GazCro

Well-known member
I have just remembered what he said. If you run it through twice it only crushes what is bigger than 40mm. The rest falls through. If you crush it down to 40mm at the start it slows the output. So chuck it all through at 100mm then chuck it all through again at 40mm. I guess it also depends on material and the crusher.
Basically it appears faster because its going through quicker but in reality isn't is what I've found tbh. Also if its not bone dry the fines tend to bind and slow it down.
 
doobin

doobin

Well-known member

Im thinking around ten 8 wheelers.

The bay that the pile starts in holds an 8 wheeler load, spilling out of the front a little.

It’s cost around £2500 to do, based upon what I hire men and machines out at plus the hire charge for the crusher and op (he loaded using my machine). Had I kept the tip pile in a bit better order then it would probably have been £2k. Really it needs the big lumps breaking up a touch before pushing the heap up, but that hasn’t happened over the first year. It will going forward, and I’ll also make sure reinforced posts and gravel boards are kept out.

Type 1 recycled (which is good gear) is £440 a lorry here. I’d value this at £350 a lorry, we pay £280 a lorry for crushed concrete which often is more mud than concrete 🙄. So if I have ten lorry’s in my pile that’s £3500 worth.

It wouldn’t be worth getting concrete tipped to crush it for that margin, but given that I’ve already charged good money to remove it from jobs, it’s a winner for me.

form an orderly queue lads :p:giggle: ... that is a long, tall, wide pile ... really can not see that fitting in 6 eight leggers:unsure:
 
Last edited:
Storrsy

Storrsy

Well-known member
Im thinking around ten 8 wheelers.

The bay that the pile starts in holds an 8 wheeler load, spilling out of the front a little.

It’s cost around £2500 to do, based upon what I hire men and machines out at plus the hire charge for the crusher and op (he loaded using my machine). Had I kept the tip pile in a bit better order then it would probably have been £2k. Really it needs the big lumps breaking up a touch before pushing the heap up, but that hasn’t happened over the first year. It will going forward, and I’ll also make sure reinforced posts and gravel boards are kept out.

Type 1 recycled (which is good gear) is £440 a lorry here. I’d value this at £350 a lorry, we pay £280 a lorry for crushed concrete which often is more mud than concrete 🙄. So if I have ten lorry’s in my pile that’s £3500 worth.

It wouldn’t be worth getting concrete tipped to crush it for that margin, but given that I’ve already charged good money to remove it from jobs, it’s a winner for me.
Sounds good, but then suppose you will have to pay additional haulage to move it all again whereas the £440 you pay for would include the transport?
 
Left hooker

Left hooker

Well-known member
Old boy that used to crush the waste Elvan stone from South crofty mine to sell said years ago to choke the crusher to get a better even crush as nothing tries to jump around and drop through un crushed
Like a 30mm concrete slab if your set at 40mm and gets the right way will pass through and out to the pile of crush so if you keep the jaws fed full everything gets crushed
 
6

6feetdown

Well-known member
form an orderly queue lads :p:giggle: ... that is a long, tall, wide pile ... really can not see that fitting in 6 eight leggers:unsure:
Nope very
Fair point. But I am usually buying an 8 wheeler of type 1 to the yard every couple of months for local jobs.

Reality is, I have to do something with all the concrete I tip at my yard!🤣
You'll get a Greta badge for saving the world
 
6

6feetdown

Well-known member
A lovely couple of days, not!
 

Attachments

  • 20220804_161050.jpg
    20220804_161050.jpg
    134.3 KB · Views: 133
  • 20220804_161100.jpg
    20220804_161100.jpg
    167.9 KB · Views: 117
  • 20220805_121009.jpg
    20220805_121009.jpg
    122.5 KB · Views: 114
  • 20220805_142524.jpg
    20220805_142524.jpg
    100 KB · Views: 121
  • 20220805_142526.jpg
    20220805_142526.jpg
    134 KB · Views: 124
Top