The pool saga continues...
Pool being repaired
Pool for sale! Can deliver locally but UK might be a stretch..
Starting to fill the pool hole after replacing the conveyor head roller bearings
After 30 tonnes of sand
Nearly there...
Finally, after 35 tonnes of wet sand and a lot of spreading by hand to the perimeter of the hole it's full. Sweaty work when it's humid & 30°C.
Half the pool will be concreted over, thats what the pier pipes are for to support the slab. Not my job, another contractor will do that and lay down new tiles over all the hard surface. The other half of the pool will be a garden bed. I'll be putting a couple of tonnes of topsoil in with the tractor loader and conveyor after the concrete is poured.