What kind of a self levelling screed would I need to take forklifts ? A 2.5T CB FLT will put 6.5T onto front wheels when loaded. Needs 8” concrete pad when I last checked, but I’ve never cracked our 3” shed floor with ours yet.
Fixing UFH direct onto concrete doesn’t scare me , done it plenty of times. Concrete nail gun helps.
Still won’t be able to use laser grader on the initial slab due to the insulation layer.
I know a guy that has a laser machine so I will chat with him. I suspect that pipes clipped to insulation with 150-180mm of power floated / fibre reinforced mix laid with a pump and levelling beams might be solution.
K-Form to maybe get it all set level and give joints….
At least then you would have good 100mm fixings and still be 30mm away from any pipes.
Just Concrete + insulation now and then UFH + screed later does have the attraction of pushing a large part of the cost and the work much further down the road