Did a couple hours of the day job then over to site and Took the moffett up the road to unload a neighbours shed. 48x20ft purlins in one pack was definitely more than 2000kg. Had to split the pack. Moffett coped well with juggling long lengths of steel about, makes your brain hurt threading 20ft stuff through a smaller gap 
Back down to site to spread about 20t of road planings around and grade off with the homemade beam. Needs a bit of rain to damp it before I run the plate over it.
Back down to site to spread about 20t of road planings around and grade off with the homemade beam. Needs a bit of rain to damp it before I run the plate over it.