Well behind with my thread so these date back from February. Diary is full for the year, demand seems to be strong on a variety of work which is good.
Bit of tarmacking at the school, resurfacing a drive, then various pothole repairs and scars - 3cx was a perfect wheelbarrow.
Then it was Gunns on tour to the Isle of Wight for a garage base and retaining wall. No 120mph winds this time and a nice U10-5 - possibly the nicest micro I've ever driven - grades like the old ZX Hitachi's!! New Cormidi track barrow was rubbish - they have gone backwards!!!
Then my first proper 3cx job at the old Brooklands racetrack. Scraping moss off the banking. Heritage England tell us we can only use a rubber edge - no sweeping allowed before you all jump in with smarter ways to do it... 3cx was ideal and made a decent saving over hiring an 8t. Museum were very impressed with the versatility and I gained an extra days hire moving pallets, clearing another area and pushing up their compost bay so the backhoe idea works for me.
Last job was a small demo and new foundations on an extension for a local builder. Came in with the 8026 and did the job in 2.5 days when the builder thought it would be 5. Now technically that's doing myself out of work - but I got 3 easy days hire, builder was happy and he's not going to go to anyone else now is he. Its how I work, different to others but I like everyone to have a win out of business - it works better in the long run. And I've got other work to be getting on with too.