Gabion walls

diggerjones

diggerjones

Well-known member
Yes 2 at a time for laying. Just moving them it would probably do 4 or more. I thought they were heavy compared to a bag of cement
 
Antony Holmes

Antony Holmes

Well-known member
are you planning to put the geogrid between the layers ? i found the quickest way was do a layer and back fill.
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better
Full artic load.🤤 when i said to the rep I'd got a grab for the digger, oh he says you won't need that 🤔😁
that Hunklinger was a hell of a buy Dylan (y)..... what a steal :cool:... and so flexible for what you use it for
 
diggerjones

diggerjones

Well-known member
looking good dose that grab grab pick up 2 at a time ?

looking good dose that grab grab pick up 2 at a time ?
20210204_121912.jpg
 
diggerjones

diggerjones

Well-known member
Anybody ever stepped these type of blocks. Need to step down a block or 2. Maybe cut a few diagonally?
 
Antony Holmes

Antony Holmes

Well-known member
Ah couldn't see it on the other pic. Looks ok like that. Probably better than cutting blocks diagonally
several way to do the step i cut a piece of cap 100mm long and then point in the small gap you can get end blocks at about £12.00 each looks good but bit on the price side
 
diggerjones

diggerjones

Well-known member
👍 think i will have 2 corner blocks left over so could use them or like you say use caps
 