diggerjones
Well-known member
Yes 2 at a time for laying. Just moving them it would probably do 4 or more. I thought they were heavy compared to a bag of cement
Yes. Think there's 2 layersare you planning to put the geogrid between the layers ? i found the quickest way was do a layer and back fill.
that Hunklinger was a hell of a buy DylanFull artic load.when i said to the rep I'd got a grab for the digger, oh he says you won't need that
![]()
Yes. Think there's 2 layers
are you putting any drainage behind them Dylan?are you planning to put the geogrid between the layers ? i found the quickest way was do a layer and back fill.
Yes Graham. Its pure sand so the drainage won't be seeing much waterare you putting any drainage behind them Dylan?![]()
looking good dose that grab grab pick up 2 at a time ?
looking good dose that grab grab pick up 2 at a time ?
i need a grab like that in my life
Think its rated at 200kg so would do a fair bit morei need a grab like that in my life
Anybody ever stepped these type of blocks. Need to step down a block or 2. Maybe cut a few diagonally?
Depends how you are planning to finish the top.Sorry mean loose some hight
Got caps going on itDepends how you are planning to finish the top.
Ah couldn't see it on the other pic. Looks ok like that. Probably better than cutting blocks diagonally
several way to do the step i cut a piece of cap 100mm long and then point in the small gap you can get end blocks at about £12.00 each looks good but bit on the price sideAh couldn't see it on the other pic. Looks ok like that. Probably better than cutting blocks diagonally