Bout time someone started talking sense.“All-electric plant isn’t yet a realistic option for our bigger sites, or for heavy plant,” Balfour Beatty group sustainability director Jo Gilroy says. “Just as the range on electric cars isn’t there yet, so the length of time plant can operate flat-out is an issue for the construction sector. ........It’s very difficult to make electrification work for big pieces, especially without a mains grid connection – and we need to ensure that there is capacity in the network. The range when they are not plugged in is limited. These larger pieces of electric equipment can also be twice the price of standard plant, and customers are often not prepared to pay the increased hire charges for them. Our view is that, for heavy plant, the priority for the industry has to be to accelerate the energy transition to hydrogen rather than relying on electric to provide the solution. ....... Now she ( Jo Gilroy ) is seeking to shatter the hype that surrounds battery power. ”
![]()
Balfour Beatty swings behind hydrogen for heavy plant
After trialling an array of battery-powered construction machinery on a site in Scotland, Balfour Beatty has concluded that hydrogen is a better fuel for heavy plant.www.theconstructionindex.co.uk
HM Gov. gonna love that
Very interesting YouTube vid on JCB Hydrogen engines, Lord B. Talking sense also.
Someone’s just got to start producing the stuff to run them on.