bobthebuilder
Well-known member
nobody reconized that the tracks were 30ft instead of 20 ft ,muppets" there was a late change in the equipment being used to move pieces of track, which had inadequate lifting capacity for the planned works. ... Warnings were also ignored, with safety systems disabled to enable the work to continue. ...
Amey failed to take measures in order to adequately manage the risks presented when tandem lifting loads of the size and weight of those undertaken on 21 October 2018. ....... We are committed to safe working practices at all times ”
'cept on this occasion![]()