JD450A
Feral as Fk 🐾
Finally attempted to get the hedge heap going.....
Leg ram has a check valve which has rusted through (standard JCB) unfortunately the prick is a one piece integral unit with the leg.
Aside from torching the prick has anyone successfully welded one up?
Leg ram has a check valve which has rusted through (standard JCB) unfortunately the prick is a one piece integral unit with the leg.
Aside from torching the prick has anyone successfully welded one up?
Attachments
Last edited: