T whiting
Well-known member
Looks a good multi purpose toolWhat you need now is a s**t load of attachments
![]()
Don't encourage me any more I've already knocked up a grading beam and my current customer has pallet forks that'll fit it on site
Looks a good multi purpose toolWhat you need now is a s**t load of attachments
![]()
That’s what I like to hereDon't encourage me any more I've already knocked up a grading beam and my current customer has pallet forks that'll fit it on site![]()







Why did you remove the blade?
looking good but if I can be so bold I would of welded a few triangles under the grading beam hangers![]()
As you have the blade off you could really go to town and fit a quick hitch from a telehandler so you can pick up forks or a bucket as well as the blade.
Just helping you while away your shutdown time. Wouldn't want you to get bored!Oh don't tempt me the long term plan is to pick up a 3 point linkage to go on the other end for all those sorts of things I'm going to have a rummage and see how much of the equipment for fitting legs is there but not used
you're hoping .... that'll be a big fat zero, unless they were on there originally and been removedI didn't want to fry any of the electrics. I did debate adding a gusset underneath but there a good 6mm thick and only hang over a inch they eyeballed as ok and didn't deflect when I put the beam on
Oh don't tempt me the long term plan is to pick up a 3 point linkage to go on the other end for all those sorts of things I'm going to have a rummage and see how much of the equipment for fitting legs is there but not used
I didn't want to fry any of the electrics. I did debate adding a gusset underneath but there a good 6mm thick and only hang over a inch they eyeballed as ok and didn't deflect when I put the beam on
I dunno there's definitely the wiring through the slew ring which is the hard part I'm intending on having the covers off the valves on the bottom half and seeing what's thereyou're hoping .... that'll be a big fat zero, unless they were on there originally and been removed
in theory .... some computer boards also have their own back up/life support batteries built in ... things have moved on a bit on the welding vehicles frontAll you have to do is remove the earth from the battery![]()
This all day every day lol,putting adaptor on piling rig foot to stop it slipping off top of H beams....900 blows each,easier to strip the foot out than risk all the electro's in machine n attachmentin theory .... some computer boards also have their own back up/life support batteries built in ... things have moved on a bit on the welding vehicles front
They done a 688p 888p and 1088p ducks DJ. I used to work for them in Victorian daysDid case do a 888 one. Think i operated one along time ago. I also drove a case poclain one
Looks a good multi purpose toolWhat you need now is a s**t load of attachments
![]()
988 used to be a staple on rail jobs along with Mec's for drainageThey done a 688p 888p and 1088p ducks DJ. I used to work for them in Victorian days



you mean you need the bits to get that back together first ... then re-install itThe job would have to go seriously tits up for me to sell it and I might as well get it done while the government is paying for the downtime which is giving me the time to strip it out and put it back in keeping the costs down.
Hopefully there's a few days work coming up at the end of next week about 100m of liniar soakawayI just need to get her back together