hiluxman
Well-known member
Concrete base for a log cabin. It was 60meters down a genal to get to. No access by any other means. 3 grab loads out and around 12t of stone back in. 5m3 of concrete so i decided on having it pumped in.
240m of timber path edgings recently, all to be scraped off and fresh chippings and membrane down whenever they order the materials.
Project transit is now drivable, the diff was totally shot. No pictures but I've a video, if anyone's that bothered
, but Needless to say it was fuked. Rebuilt with a second hand diff internals out of a known good one. Was easier to do this than do an axle swap. Bit more tidying to do then it'll be mot time and then I'll look at mounting the crane on it.
And he's a picture of the grab
Loading rocks for one of my customers
240m of timber path edgings recently, all to be scraped off and fresh chippings and membrane down whenever they order the materials.
Project transit is now drivable, the diff was totally shot. No pictures but I've a video, if anyone's that bothered
And he's a picture of the grab
Loading rocks for one of my customers