T whiting
Well-known member
The bucket ram goes too far over and won't curl the pallet back up as the boom drops
that's true of most machines thoughThe bucket ram goes too far over and won't curl the pallet back up as the boom drops
can also get a Mec with a 'std' exc. boom too (dipper ram on top of the boom)
Pretty sure you’d not want to be risking the pants down scenario if caught using that on a building siteswap out the mast for my forks in the pic below -- I could do second lift with the 'Drema (3rd, 4th & 5th with the mast on) -- 1st lift'd be a POP
View attachment 62310 View attachment 62311
Yes I have endured the wrath of my wife on numerous occasions whilst on holiday for commenting & spending too long checking out small building sites with small site cranes!To be entirely honest telehandlers aren't exactly the best things going. So big and clumsy. Make a mess. Get in the way. Tip everything off the pallet spontaneously for no reason at all.
The European sites with self erecting tower cranes look a far better way of working.
could always get it testedPretty sure you’d not want to be risking the pants down scenario if caught using that on a building site![]()
Fixed that for youYes I have endured the wrath of my wife on numerous occasions whilst on holiday for commenting & spending too long checking out small building sites with small site cranes!
They often however look dodgier & uncertified MORE THAN some of @V8Druid s contraptions!![]()
I hadn't even seen this thread until you tagged me Grahamat a seeeeeerious price ... bloody great lifters though Adam @APhillips 'll be along shortly I'm sure to tell you what a hell of a tool they are![]()
Only for road maintenance.this is interesting -- mentioned several times on here over the years .... however -- the devil is in the detail
![]()
JCB claims credit for towing regs reform
A change in the towing regulations means that it is now possible to get permission to tow a trailer behind construction plant.www.theconstructionindex.co.uk
" The Vehicle Certification Agency (VCA) has create a new vehicle special order (VSO) that can be applied for in Great Britain. Under the new regulation, it will be possible for customers to get a permit to use wheeled engineering plant, such as backhoe loaders and wheeled excavators, to tow a trailer on the highway, for the purposes of construction, maintenance, and repair of roads.
Under the new order, construction plant will be permitted to tow a trailer that is unladen, or that is carrying material or tools to and from a road construction, repair, or maintenance site. The machines will be allowed to tow on all types of roads, other than motorways, at speeds of up to 20mph. The wheeled engineering plant must be road-registered and comply with all applicable aspects of the Road Vehicles (Construction and Use) Regulations 1986. The overall length of the combined machine and trailer cannot exceed eight metres and the trailer must bear the same number plate as the towing machine. "
8m is not a lot
Not an automatic right and there will without doubt be an enormous amount of cr*p to wade through to comply .... don't hold your breath
Only for road maintenance.
How hard to put a hitch on a wheel digger then …. ?Don't worry about that, tractors are for farming remember. Let's see how many fastraks are swapped out for hydradigs
Bolt a tow ball to the back of the bucket you'll be laughingHow hard to put a hitch on a wheel digger then …. ?
6 tonne dump trailer?Bolt a tow ball to the back of the bucket you'll be laughing![]()
No small trailer that will bethis is interesting -- mentioned several times on here over the years .... however -- the devil is in the detail
![]()
JCB claims credit for towing regs reform
A change in the towing regulations means that it is now possible to get permission to tow a trailer behind construction plant.www.theconstructionindex.co.uk
" The Vehicle Certification Agency (VCA) has create a new vehicle special order (VSO) that can be applied for in Great Britain. Under the new regulation, it will be possible for customers to get a permit to use wheeled engineering plant, such as backhoe loaders and wheeled excavators, to tow a trailer on the highway, for the purposes of construction, maintenance, and repair of roads.
Under the new order, construction plant will be permitted to tow a trailer that is unladen, or that is carrying material or tools to and from a road construction, repair, or maintenance site. The machines will be allowed to tow on all types of roads, other than motorways, at speeds of up to 20mph. The wheeled engineering plant must be road-registered and comply with all applicable aspects of the Road Vehicles (Construction and Use) Regulations 1986. The overall length of the combined machine and trailer cannot exceed eight metres and the trailer must bear the same number plate as the towing machine. "
8m is not a lot
Not an automatic right and there will without doubt be an enormous amount of cr*p to wade through to comply .... don't hold your breath
3500kg max!6 tonne dump trailer?
not that difficult on either BHL or duck .... mate of mine used to run around with his case BHL with an Ifor behind him --- 'til he got pulledHow hard to put a hitch on a wheel digger then …. ?
What was the fine…?not that difficult on either BHL or duck .... mate of mine used to run around with his case BHL with an Ifor behind him --- 'til he got pulled(by a plod that knew his C&Us)
O/A length ... don't forget there's a lot out front on a BHL or a duck especially a mono boomed one ... a 3CX is 5.9m, so 3.1m including the draw bar and whatever form of coupling you fit to the back of the BHL ... gonna be a camping size trailer on a duckNo small trailer that will be