Canal Navvy
Well-known member
Another one of those schemes that involves using an approved installer I believeheard today on the box that anything to do with solar is zero rated on the VAT front????? is that true?
Another one of those schemes that involves using an approved installer I believeheard today on the box that anything to do with solar is zero rated on the VAT front????? is that true?
And then costs a heap more money. That's the trouble with any renewables they've heaped the cost up as they expect most folk be getting a grant or payback of some kind.Another one of those schemes that involves using an approved installer I believe![]()
If you use an MCS installer. 20% on materials if you DIYheard today on the box that anything to do with solar is zero rated on the VAT front????? is that true?
just had panels fitted by caplor of hereford ,£4300 fitted, 4kw ,scaffold was up alreadyAnd then costs a heap more money. That's the trouble with any renewables they've heaped the cost up as they expect most folk be getting a grant or payback of some kind.
They don’t store it!! Someone else gets to use it straight away.re solar panels payments EON pays only for 50% of what I produce and gives me 5,38 p per kwh but charge me 23.36p per kwh so EON are making 18.22p per kwh out of me for storing it so I can use it later , EON are still ripping me off
Just panels? Or battery wall too?just had panels fitted by caplor of hereford ,£4300 fitted, 4kw ,scaffold was up alreadyView attachment 38874
I did realize that they don't store it just pointing out they were making over 18 p per kWh out of me can't do water heating as got a pair of solar water heater panels which heats a large tank with very hot waterThey don’t store it!! Someone else gets to use it straight away.
In fairness, you are being paid 50% of what you generate regardless of you export any. Unless we have an export meter you could divert the surplus into water heating and still get the 50%
you getting 3ph installed at chez Cyberprog????Have ordered my first EV a few weeks ago. Getting the new Niro EV! 286 miles, 77kW charging. Looking forward to it!
just had panels fitted by caplor of hereford ,£4300 fitted, 4kw ,scaffold was up alreadyView attachment 38874
they're a big enough PITFA to get past, without bloody trailers, usually crammed with kids.I think if people were serious about being eco then push bikes are the answer. People would be healthier too. Instead of hs2 wouldn't a network of cycle paths be a better way of getting cars off the road? Modern bikes are are extremely efficient, and you can get help from an electric motor. Obviously towing is a problem... but actually you can get trailers for bikes.
just panels for now,and i boost thingJust panels? Or battery wall too?
not possible on that particular roofwould have looked 1000% better if they had used the 30 quid in roof trays.
and what's that do?just panels for now,and i boost thing
excess power into the immersion heaterand what's that do?
what's it do if the tank is at/up to temperature??excess power into the immersion heater
F allwhat's it do if the tank is at/up to temperature??
well as long as it doesn't burn the hutch down, then, that's OKF all