The 'Today's Job' thread

GazCro

GazCro

Well-known member
You haven't said much about you new 8t .... happy with it ?
Yeah -2 a lot better especially the tracking which was the biggest let down. A fair bit more aux flow as well which actually came with its own issues. Getting 115lpm flow to crusher bucket was creating 19 bar back pressure in return and going to blow motor seals. This is the bit they never tell you with headline figures is ok having the flow but no good if you can't get it back to the tank. Anyway 1" return to tank via filter has sorted it which was recommended by bucket supplier anyway tbh.
 
L

Lynchy

Well-known member
New cell ready for all kinds of toxic crap,pond life
 

Attachments

  • IMG_20220120_135804_429.jpg
    IMG_20220120_135804_429.jpg
    226.9 KB · Views: 177
  • IMG_20220120_135624_661.jpg
    IMG_20220120_135624_661.jpg
    367.8 KB · Views: 175
Lancs Lad

Lancs Lad

Well-known member
Dig a bit peck a bit dig a bit more screen a bit crush a bit level out carry on. Not the way I'd like to work but for one reason or another out of my control were doing something at the end of the job which should have been done at the start. Putting driveway and parking in on an ongoing job no room to work but no good twining just get it done. View attachment 31501View attachment 31502
Borrowdale? Been a grand week, was up honister on Monday Ruddy beautiful day 👌
 
GazCro

GazCro

Well-known member
Totally standard machine other than 2 piece boom. Hitch pipework hammer lines and rotate lines are standard on uk machines. Pretty much only option other than buckets is rubber or steel tracks.
I never enquired about 1" return line but I'd doubt there a factory option so i just made my own up.
20210508_123211.jpg
20220107_101900.jpg
20220121_093802.jpg
 
M

Monkeybusiness

Well-known member
V8Druid

V8Druid

do it as well as you can,but learn to do it better
L

Lynchy

Well-known member
last thing Friday,ready to go at it Monday
 

Attachments

  • IMG_20220121_163720_296.jpg
    IMG_20220121_163720_296.jpg
    183.8 KB · Views: 174
  • IMG_20220121_163039_221.jpg
    IMG_20220121_163039_221.jpg
    246.4 KB · Views: 186
Bob

Bob

Well-known member
In the sixtys from sometime september if you did not dig tracks out you would not be moving in the morning sometimes we had to run tracks on to wood
 
L

Lynchy

Well-known member
Why bother cleaning it off? :unsure:
40t 22 m long reach its a big chunk of change,working n tracking through gravel n mud if it gets left n hard packed nightmare to get out,seen machines left then freeze specially smaller rubber tracked n won't move,keep on top of it n stops wear plus I like to keep machine tidy,put best part of grease cartridge into hitch n dipper/ bucket ram hitch pins every lunchtime with working in water
 
Top