V8Druid
do it as well as you can,but learn to do it better
stunning retaining wall next door !!!!!
stunning retaining wall next door !!!!!
I prefer to think of it as upcyclingNothing like repeat work
Nice job and lovely spotBeen rock facing this riverbank over the past 10 days. Half the job (literally) was just getting access track put in and bringing the stone in as awkward access for about 600meter.
The bridge was about to get washed away- another year and I reckon it would have gone. Been quite a job for my poor old TB125.
Awesome job. Absolute work of art.Been rock facing this riverbank over the past 10 days. Half the job (literally) was just getting access track put in and bringing the stone in as awkward access for about 600meter.
The bridge was about to get washed away- another year and I reckon it would have gone. Been quite a job for my poor old TB125.
Thanks. The bit under the bridge is rougher than id have liked tbh but was max lift capacity of digger at full stretch and trying to post them in under neath the bridge without knocking the dodgy abutment was hard enough without worrying too much what it looked like!Ridiculous how nice a job you’ve made of that!
I believe this is the same job you were chatting about many months ago? I seem to recall the concrete rings used as piersThanks. The bit under the bridge is rougher than id have liked tbh but was max lift capacity of digger at full stretch and trying to post them in under neath the bridge without knocking the dodgy abutment was hard enough without worrying too much what it looked like!
ChapeauBeen rock facing this riverbank over the past 10 days. Half the job (literally) was just getting access track put in and bringing the stone in as awkward access for about 600meter.
The bridge was about to get washed away- another year and I reckon it would have gone. Been quite a job for my poor old TB125.
That's the one. Yeah severely undermined- could wiggle my arm right underneath the concrete slab. Not surprising as the slab was sitting on a bed of soft peaty s**t with a bit of gravel they'd chucked in before laying the slab. Apparently done by the Royal engineers as a training exercise back in the day.I believe this is the same job you were chatting about many months ago? I seem to recall the concrete rings used as piers
Yeah I remember as we're asking for advice iircI believe this is the same job you were chatting about many months ago? I seem to recall the concrete rings used as piers
Wowsers but no doubt very much needed.May need a bigger digger
![]()
Muckshifters called up for £2.2bn Abingdon reservoir
Thames Water starts early engagement with earthworks firms for vast Oxfordshire jobwww.constructionenquirer.com
This has been on the cards for a long time, Walters will likely be involved in it. They were gearing up for it 20 years ago when i was thereMay need a bigger digger
![]()
Muckshifters called up for £2.2bn Abingdon reservoir
Thames Water starts early engagement with earthworks firms for vast Oxfordshire jobwww.constructionenquirer.com
they'll have worn out all the gear by now thenThis has been on the cards for a long time, Walters will likely be involved in it. They were gearing up for it 20 years ago when i was there![]()
aye, 'tis some hole to create and bund - especially 25m highOnly a handful that will be able to go for it, I’d say Collins will have a go of it!
I'll order a couple of new wheel barrows, between us all we should be able to complete thisMay need a bigger digger
![]()
Muckshifters called up for £2.2bn Abingdon reservoir
Thames Water starts early engagement with earthworks firms for vast Oxfordshire jobwww.constructionenquirer.com