The 'Today's Job' thread

Furniss

Furniss

Well-known member
20230418_152900.jpg
Dont think a job goes by when this truck doesn't make life easier, and not just a bit.
 
Storrsy

Storrsy

Well-known member
Customers texting you at 21.30 asking you to go look at a job which you have already looked at and quoted for 🤦‍♂️
Get that all the time. A right pain in the arse. You spend good time looking discussing and then quoting then suddenly they change their mind about something and what you to go back and discuss all over again. Fair enough the first time but feel there should be a way of mitigating having to do it a second time for free. Its the public/council works that are the worst- because they only work 9-5 it's not like you can just drop by at a convenient time on the way home etc, so more lost time before the jobs even been confirmed😫
 
D

DaveDCB

Well-known member
Dont suppose we could have a cash deal?
Just want the whole thing explaining again and again! I do feel sorry for them as the previous builder they had do the extension has made a real bodge of it and pushed the project spend way over budget!
I told them I’d do it on day rate plus materials at cost, but I’m starting to think a whole price would have suited them better as they don’t seem to like the uncertainty of it all!
Reminds me of why I keep away from these small jobs and would rather do my own builds to sell!
 
B

Brendan

Well-known member
Get that all the time. A right pain in the arse. You spend good time looking discussing and then quoting then suddenly they change their mind about something and what you to go back and discuss all over again. Fair enough the first time but feel there should be a way of mitigating having to do it a second time for free. Its the public/council works that are the worst- because they only work 9-5 it's not like you can just drop by at a convenient time on the way home etc, so more lost time before the jobs even been confirmed😫
I've tried to stop going out to do site visits especially for all the small jobs, can do most of it from pics and measurements or rough areas of Google earth. Get a few less wasters and saves 1+ hour by time drive there and go through it all. If it's something more involved I will go out but tend to give a rough estimate before hand which still doesn't quite weed the dreamers/idiots out.
 
Giles

Giles

Well-known member
Water main

Oh joy rock again this time hard limestone

Started with 1.5 and 1 as access was tight, wouldn't really touch it so shot off got 3 ton squeezed it in but going to need ripper or breakers.

Going to insulate it and put it in shallow as bed rock at about 500mm or more not feeding a trough for heritage grazing in warmer months.

New turf cutter doing a grand job
 

Attachments

  • 05C33C95-46D8-4974-9FB2-E4FF4D85DE9D.jpeg
    05C33C95-46D8-4974-9FB2-E4FF4D85DE9D.jpeg
    332.9 KB · Views: 171
  • 7669AF8C-58C1-4358-8788-147F28754068.jpeg
    7669AF8C-58C1-4358-8788-147F28754068.jpeg
    559.1 KB · Views: 173
  • 958357E8-CB3E-43BD-A6D9-6B53E72BB09C.jpeg
    958357E8-CB3E-43BD-A6D9-6B53E72BB09C.jpeg
    447.6 KB · Views: 177
  • 2EE58983-E24C-4E71-8A2C-EB7BA77F2815.jpeg
    2EE58983-E24C-4E71-8A2C-EB7BA77F2815.jpeg
    412.1 KB · Views: 164
  • 83DC9580-F311-49A5-9A1F-83C9E04A4F13.jpeg
    83DC9580-F311-49A5-9A1F-83C9E04A4F13.jpeg
    566.1 KB · Views: 148
B

Brendan

Well-known member
Been installing a waste treatment plant, got it in and mostly backfilled, sample chambers are mega expensive at £300 ish, so made a home brew one consisting of a 320mm manhole and a few risers and a lid for £60 ish
 
Last edited:
diggerjones

diggerjones

Well-known member
Water main

Oh joy rock again this time hard limestone

Started with 1.5 and 1 as access was tight, wouldn't really touch it so shot off got 3 ton squeezed it in but going to need ripper or breakers.

Going to insulate it and put it in shallow as bed rock at about 500mm or more not feeding a trough for heritage grazing in warmer months.

New turf cutter doing a grand job
It will freeze where it comes out of the ground anyway, so i wouldn't worry about being a bit shallow in places
 
Furniss

Furniss

Well-known member
Water main

Oh joy rock again this time hard limestone

Started with 1.5 and 1 as access was tight, wouldn't really touch it so shot off got 3 ton squeezed it in but going to need ripper or breakers.

Going to insulate it and put it in shallow as bed rock at about 500mm or more not feeding a trough for heritage grazing in warmer months.

New turf cutter doing a grand job
Still à few old kx71s putting a shift in, couldn't get the 6t in here so it's done the lot.
20230418_172441.jpg
20230419_172614.jpg
 
Giles

Giles

Well-known member

Attachments

  • 4B76494F-2534-4D09-91EC-908A78C1B7E9.jpeg
    4B76494F-2534-4D09-91EC-908A78C1B7E9.jpeg
    435.4 KB · Views: 153
  • B1A49811-E7D5-4679-B584-399BD8B74FC0.jpeg
    B1A49811-E7D5-4679-B584-399BD8B74FC0.jpeg
    420 KB · Views: 156
  • 9F052DC6-9659-41C4-86DA-8C5EC68E6C00.jpeg
    9F052DC6-9659-41C4-86DA-8C5EC68E6C00.jpeg
    381.3 KB · Views: 160
  • B9180AA4-D00A-41F6-930C-7E7EC07A1494.jpeg
    B9180AA4-D00A-41F6-930C-7E7EC07A1494.jpeg
    550.5 KB · Views: 183
D

DaveDCB

Well-known member
I know let’s bury the old cow stalls in the 10” thick c40 concrete, it will really help strengthen it up.. or just annoy the fella who’s digging it up 20yrs later! 🤦‍♂️
 

Attachments

  • B439217C-4525-4D17-A5D4-3982A2EFCAAA.jpeg
    B439217C-4525-4D17-A5D4-3982A2EFCAAA.jpeg
    357.7 KB · Views: 192
Top