Get that all the time. A right pain in the arse. You spend good time looking discussing and then quoting then suddenly they change their mind about something and what you to go back and discuss all over again. Fair enough the first time but feel there should be a way of mitigating having to do it a second time for free. Its the public/council works that are the worst- because they only work 9-5 it's not like you can just drop by at a convenient time on the way home etc, so more lost time before the jobs even been confirmedCustomers texting you at 21.30 asking you to go look at a job which you have already looked at and quoted for![]()
Customers texting you at 21.30 asking you to go look at a job which you have already looked at and quoted for![]()
Just want the whole thing explaining again and again! I do feel sorry for them as the previous builder they had do the extension has made a real bodge of it and pushed the project spend way over budget!Dont suppose we could have a cash deal?
My usual one on domestic jobs …you’re about 20% over our budget is there any part of the job you could knock offDont suppose we could have a cash deal?
I've tried to stop going out to do site visits especially for all the small jobs, can do most of it from pics and measurements or rough areas of Google earth. Get a few less wasters and saves 1+ hour by time drive there and go through it all. If it's something more involved I will go out but tend to give a rough estimate before hand which still doesn't quite weed the dreamers/idiots out.Get that all the time. A right pain in the arse. You spend good time looking discussing and then quoting then suddenly they change their mind about something and what you to go back and discuss all over again. Fair enough the first time but feel there should be a way of mitigating having to do it a second time for free. Its the public/council works that are the worst- because they only work 9-5 it's not like you can just drop by at a convenient time on the way home etc, so more lost time before the jobs even been confirmed![]()
It will freeze where it comes out of the ground anyway, so i wouldn't worry about being a bit shallow in placesWater main
Oh joy rock again this time hard limestone
Started with 1.5 and 1 as access was tight, wouldn't really touch it so shot off got 3 ton squeezed it in but going to need ripper or breakers.
Going to insulate it and put it in shallow as bed rock at about 500mm or more not feeding a trough for heritage grazing in warmer months.
New turf cutter doing a grand job
We lag them with armacell insulation where they go in and come out the ground. It’s the good stuff they use on aircon or bar lines,It will freeze where it comes out of the ground anyway, so i wouldn't worry about being a bit shallow in places
I know the stuff. Proper jobWe lag them with armacell insulation where they go in and come out the ground. It’s the good stuff they use on aircon or bar lines,
This won’t be turned on till cows go in April 24th every other year
Still à few old kx71s putting a shift in, couldn't get the 6t in here so it's done the lot.Water main
Oh joy rock again this time hard limestone
Started with 1.5 and 1 as access was tight, wouldn't really touch it so shot off got 3 ton squeezed it in but going to need ripper or breakers.
Going to insulate it and put it in shallow as bed rock at about 500mm or more not feeding a trough for heritage grazing in warmer months.
New turf cutter doing a grand job
Tough day for her today nearly 5k hours ripping limestone new to hinowa proving useful on tight access jobStill à few old kx71s putting a shift in, couldn't get the 6t in here so it's done the lot.
View attachment 46325View attachment 46326
Cleaning out after I’ve ripped itWhats your man on the 1.5 digger doing apart from getting a sun tan![]()
My first thoughts.. but not for me to commentOh. Just thought he would of straddled or crossed the trench for that job