Dig trench by eye on slightly deeper side gravel then lift pipe in gravel to grade if not steep enough then unfortunately it’s shovel if can’t get back in.

have used laser before etc but then ppl get too concerned over mm etc this just works well and fast. Don’t use my pipe laser anymore unless on big run of big pipe
For short runs like that it gets the job done (y)
 
S

Smiffy

Well-known member
Done the block on the level before as well but seen lads have it wrong way Rd lol 😂

Done duel grade etc but takes time etc if going rd building got to move laser etc this just works was only 50 quid can be left on site or in digger thrown in trench does top water as well just by moving it.

I’ll take Pepsi challenge with anyone 2 runs of pipe foul and top into an ic etc be 3x quicker with pipe level vs laser only comparable would be 2 levels with different blocks


Rather than moving the laser another way is to just get the labourer to move the receiver 20mm every time they take a stride forwards. This quite quick and gives relatively tidy trenches with no going back to dig extra out.
If you have a digital receiver you can even just do it off the readout. The Leica ones have a 120mm receiver so you only have to adjust it every 6m length of pipe.
 
JerryRtilt

JerryRtilt

Well-known member
Do you have 2 x Cradle and wires for your 2 machines ?
I swap Idig between 3t and 8t machines, only takes minutes when you have cradles set up in both machines and you can keep all the cables permanently in place nice and tidy, well worth the extra investment 👍
 
Grahams

Grahams

Don't complain - suggest what's better
I swap Idig between 3t and 8t machines, only takes minutes when you have cradles set up in both machines and you can keep all the cables permanently in place nice and tidy, well worth the extra investment 👍
I have gone the intermediate way, plates on all three machines, but need to swap screen and cradle. Takes less than ten minutes, but I don’t worry how tidy the cables are as long as they are out of the way.
 
JerryRtilt

JerryRtilt

Well-known member
I have gone the intermediate way, plates on all three machines, but need to swap screen and cradle. Takes less than ten minutes, but I don’t worry how tidy the cables are as long as they are out of the way.
I spent a small fortune on RAM Mount bits in the Volvo trying to keep the cradle steady and mount the Rototilt screen at the same time, surprisingly difficult in a small cab when you need clearance for the window, levers etc and still be in a convenient position .
tempImage2OVSap.png
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better
I spent a small fortune on RAM Mount bits in the Volvo trying to keep the cradle steady and mount the Rototilt screen at the same time, surprisingly difficult in a small cab when you need clearance for the window, levers etc and still be in a convenient position .View attachment 44175
that looks like one EXPENSIVE bit of glass with the slider in it Jerry :oops:
 
Furniss

Furniss

Well-known member
I have put 2 x dedicated ram mounts instead of those terrible suction cups so at least it doesn't fall on the floor.
Obviously sensor plates on 2 machines but still mess about swopping cradles and cables which honestly I hate.
The reason I haven't invested in another set of cables and cradle apart from the 700€ quoted (ages ago) is that I intend hard wiring it as factory tidy as possible into the 6t and leaving it in.
It's sold as easily swopped buy I bet the vast majority of people end up with 2 x sets of cables/cradles because it's a pita even if its 5 minutes.
 
JerryRtilt

JerryRtilt

Well-known member
I have put 2 x dedicated ram mounts instead of those terrible suction cups so at least it doesn't fall on the floor.
Obviously sensor plates on 2 machines but still mess about swopping cradles and cables which honestly I hate.
The reason I haven't invested in another set of cables and cradle apart from the 700€ quoted (ages ago) is that I intend hard wiring it as factory tidy as possible into the 6t and leaving it in.
It's sold as easily swopped buy I bet the vast majority of people end up with 2 x sets of cables/cradles because it's a pita even if its 5 minutes.
I hate cables flapping about in the cab, might be worth speaking to' Niel at Nasco Digtec' for extra bits, helpful bloke. (y)
 
Giles

Giles

Well-known member
Rather than moving the laser another way is to just get the labourer to move the receiver 20mm every time they take a stride forwards. This quite quick and gives relatively tidy trenches with no going back to dig extra out.
If you have a digital receiver you can even just do it off the readout. The Leica ones have a 120mm receiver so you only have to adjust it every 6m length of pipe.
I meant more like if you go rd a corner lose line of sight to laser and no where to set it up on corner to do both etc or all the way rd a house plus in bright sun on big jobs 100m etc loose accuracy and receiver can’t locate laser
 