Im thinking around ten 8 wheelers.
The bay that the pile starts in holds an 8 wheeler load, spilling out of the front a little.
It’s cost around £2500 to do, based upon what I hire men and machines out at plus the hire charge for the crusher and op (he loaded using my machine). Had I kept the tip pile in a bit better order then it would probably have been £2k. Really it needs the big lumps breaking up a touch before pushing the heap up, but that hasn’t happened over the first year. It will going forward, and I’ll also make sure reinforced posts and gravel boards are kept out.
Type 1 recycled (which is good gear) is £440 a lorry here. I’d value this at £350 a lorry, we pay £280 a lorry for crushed concrete which often is more mud than concrete

. So if I have ten lorry’s in my pile that’s £3500 worth.
It wouldn’t be worth getting concrete tipped to crush it for that margin, but given that I’ve already charged good money to remove it from jobs, it’s a winner for me.