The 'Today's Job' thread

doobin

doobin

Well-known member
Cleaning out a pond whilst it’s dry. Bit much of a run and on tarmac, so rather than use the tracked dumper I’m using the loader to bring it to the side and then rehandling into the 3t wheeled dumper.
AA006FC1-8AAD-4D61-B632-D247830655A3.jpeg
 
D

DaveDCB

Well-known member
Just double checked today with SP energy who are doing a new connection for us at the moment, all they are supplying is 32mm..
 
Left hooker

Left hooker

Well-known member
Just double checked today with SP energy who are doing a new connection for us at the moment, all they are supplying is 32mm..
Wpd are upgrading most of the network in advance which is good forward thinking for a big firm
Last 4 new builds I've been involved for customers have all got 3ph
Even the annex our lorry driver has built for his son I had to do the trenching and ducting for 3ph
Not done a single phase duct for some time there is a new build I'm involved with will still be single phase as no 3ph on poles and doubt he will pay for larger transformer just for himself
 
D

DaveDCB

Well-known member
Lads who did the road crossings said the network around here can’t take any more load, and it’s basically a mess! So I guess they probably have the thought that if everything is small duct people won’t bother with 3ph upgrade 😂
 
GazCro

GazCro

Well-known member
Lads who did the road crossings said the network around here can’t take any more load, and it’s basically a mess! So I guess they probably have the thought that if everything is small duct people won’t bother with 3ph upgrade 😂
I'm assuming Enwl are thinking the same round here. As yet still only 32mm duct for service cables into houses and when i questioned the last leccy board fella about the possiblity of several leccy cars charging at each house he didn't seem bothered. I wonder if some leccy companies are thinking they'll be paid to upgrade by govt so why waste their own money doing it in advance.
 
Lancs Lad

Lancs Lad

Well-known member
I'm assuming Enwl are thinking the same round here. As yet still only 32mm duct for service cables into houses and when i questioned the last leccy board fella about the possiblity of several leccy cars charging at each house he didn't seem bothered. I wonder if some leccy companies are thinking they'll be paid to upgrade by govt so why waste their own money doing it in advance.
Sounds about right for ENWL 😏
 
Furniss

Furniss

Well-known member
Hot and dusty last few weeks ....old 8t clocked 6000hrs - tools all that hot you cant hold them and dumper seat was unsittable on 🙂 buggered off to coast last minute decision 5pm sat night - put tent up and went for tea 😎 then a swim in morning before home .... very lucky to live so close to unspoilt coastline.
20220709_202026.jpg
20220710_110349.jpg
20220713_120313.jpg
20220713_113136.jpg

20220713_111654.jpg

20220708_153620.jpg

20220708_141830.jpg
20220712_171900.jpg
 
Last edited:
B

bobthebuilder

Well-known member
I'm assuming Enwl are thinking the same round here. As yet still only 32mm duct for service cables into houses and when i questioned the last leccy board fella about the possiblity of several leccy cars charging at each house he didn't seem bothered. I wonder if some leccy companies are thinking they'll be paid to upgrade by govt so why waste their own money doing it in advance.
after doing a few recently and got to khow the wpd man ,his opinion is 100m black leccy duct ,cover all eventuallitys
 
Storrsy

Storrsy

Well-known member
Hot and dusty last few weeks ....old 8t clocked 6000hrs - tools all that hot you cant hold them and dumper seat was unsittable on 🙂 buggered off to coast last minute decision 5pm sat night - put tent up and went for tea 😎 then a swim in morning before home .... very lucky to live so close to unspoilt coastline.View attachment 37526View attachment 37525View attachment 37524View attachment 37522
View attachment 37527
View attachment 37528
View attachment 37529View attachment 37523
Looks spectacular- lucky boy!
How many hours has your 71-3 done?
 
Giles

Giles

Well-known member
Same job as watermain dig now on drainage same story rock after rock in the way
 

Attachments

  • DD4088DC-8EE7-42D7-BCBD-DA8E363A1D78.jpeg
    DD4088DC-8EE7-42D7-BCBD-DA8E363A1D78.jpeg
    411.3 KB · Views: 160
  • E029D264-5982-4826-93A5-3055CD856252.jpeg
    E029D264-5982-4826-93A5-3055CD856252.jpeg
    363.2 KB · Views: 161
  • 5E1AAAD2-FD7A-4458-AF91-2E4C519F492A.jpeg
    5E1AAAD2-FD7A-4458-AF91-2E4C519F492A.jpeg
    410.8 KB · Views: 176
Furniss

Furniss

Well-known member
Looks spectacular- lucky boy!
How many hours has your 71-3 done?
4300 ish - bought it off a mate about 2 years ago at 3300hrs - had quite a few things to sort on it at first but it's settled down and its very decent, stable - smooth only real gripe is its a bit noisy in hydraulics.
Plan to have a reshuffle when values drop but in reality it all would go on for fair bit longer I suppose as it's very light work and 8t has averaged 415hrs yearly in 6years - 3t 330hrs yearly in 2 - 1.7t kub 50hrs yearly in 2.
 
Top