Left hooker
Well-known member
63 mm ducting and hockey stick to match now for 3 phase oh and larger box to be built in to wallTurns out Western Power gave us the wrong size hockey stick so may have to core through the toe now for a bigger duct![]()
63 mm ducting and hockey stick to match now for 3 phase oh and larger box to be built in to wallTurns out Western Power gave us the wrong size hockey stick so may have to core through the toe now for a bigger duct![]()
future proofing according to the wpd man ,as i said houses could have 2 car chargers minimum,ashp,etc,also a bigger meterboxAny need for it? Just a bigger bill for the end user otherwise.. we’ve built some pretty big houses and none needed over 100a.. even my industrial unit is only 1ph![]()
Wpd are upgrading most of the network in advance which is good forward thinking for a big firmJust double checked today with SP energy who are doing a new connection for us at the moment, all they are supplying is 32mm..
And a bigger left box to put the charger cable out!!future proofing according to the wpd man ,as i said houses could have 2 car chargers minimum,ashp,etc,also a bigger meterbox
Yeah we were told the samefuture proofing according to the wpd man ,as i said houses could have 2 car chargers minimum,ashp,etc,also a bigger meterbox
I'm assuming Enwl are thinking the same round here. As yet still only 32mm duct for service cables into houses and when i questioned the last leccy board fella about the possiblity of several leccy cars charging at each house he didn't seem bothered. I wonder if some leccy companies are thinking they'll be paid to upgrade by govt so why waste their own money doing it in advance.Lads who did the road crossings said the network around here can’t take any more load, and it’s basically a mess! So I guess they probably have the thought that if everything is small duct people won’t bother with 3ph upgrade![]()
Sounds about right for ENWLI'm assuming Enwl are thinking the same round here. As yet still only 32mm duct for service cables into houses and when i questioned the last leccy board fella about the possiblity of several leccy cars charging at each house he didn't seem bothered. I wonder if some leccy companies are thinking they'll be paid to upgrade by govt so why waste their own money doing it in advance.
after doing a few recently and got to khow the wpd man ,his opinion is 100m black leccy duct ,cover all eventuallitysI'm assuming Enwl are thinking the same round here. As yet still only 32mm duct for service cables into houses and when i questioned the last leccy board fella about the possiblity of several leccy cars charging at each house he didn't seem bothered. I wonder if some leccy companies are thinking they'll be paid to upgrade by govt so why waste their own money doing it in advance.
Looks spectacular- lucky boy!Hot and dusty last few weeks ....old 8t clocked 6000hrs - tools all that hot you cant hold them and dumper seat was unsittable onbuggered off to coast last minute decision 5pm sat night - put tent up and went for tea
then a swim in morning before home .... very lucky to live so close to unspoilt coastline.View attachment 37526View attachment 37525View attachment 37524View attachment 37522
View attachment 37527
View attachment 37528
View attachment 37529View attachment 37523
They’re not lovely when your trying to pull a nice neat 12” trench and you end up with a bomb crater as you’ve had to pull 4 out lol and swapped from 5 ton to 16 ton in frustrationSome lovely chunks of rock there @Giles
4300 ish - bought it off a mate about 2 years ago at 3300hrs - had quite a few things to sort on it at first but it's settled down and its very decent, stable - smooth only real gripe is its a bit noisy in hydraulics.Looks spectacular- lucky boy!
How many hours has your 71-3 done?