J
That’s crazy.Cheap enough to hire round my way this was around 30 quid hr with operator plus extra for breaker and you pay for the travelling
Cheap enough to hire round my way this was around 30 quid hr with operator plus extra for breaker and you pay for the travelling
Cheaper than that round here. I charge min of 10hours inc travelThat’s crazy.
I don't work it out per hour, too many variables. Every job is different hour to hour, day to day ect.How much do people reckon it must cost per hr to run that machine all In.
If they do a lot of council/highway work it's v little hours on the machine compared to what's charged out and an op on peanuts. Still doesn't make much but seems to be enough.I reckon it's prob gone up a bit now that was couple year ago. I think it was 250 for 8 hr day inc travel with 50 extra for them bringing the breaker. Minimum 8hr hire. The machine was pretty much brand new they run a few of them so it must pay. Lot of council and highways work
on a pension there loading that lot with the back endCheap enough to hire round my way this was around 30 quid hr with operator plus extra for breaker and you pay for the travelling
Seat be worn tho ...and flask spot rubbed through.If they do a lot of council/highway work it's v little hours on the machine compared to what's charged out and an op on peanuts. Still doesn't make much but seems to be enough.
Lol it was actually easier. He did the first load with the front but was a tight little infill plot and tearing everything up. I'm sure he said something like they're equivilant to an 8 tonner with reach on extra dig?on a pension there loading that lot with the back end![]()
6t is equivalent. And based on photos looks like front would be faster. I've heard of a few machines locally that will only use back end as they cant or Don't have experience loading lorries with front bucket.Lol it was actually easier. He did the first load with the front but was a tight little infill plot and tearing everything up. I'm sure he said something like they're equivilant to an 8 tonner with reach on extra dig?
I'll have to defer to your expertise but like I say did the first lorry that way and wasn't too much in it. He got everything done in the day I needed was happy with the 300quids worth. Those wagons were 60 quid a load for that hard-core. They operate from a place not far crush it then re sell it. The backhoe firm own the yard and used to run it but they got too much agro off the caravan enthusiasts taking crap in then making threats if owt was said. Occasionally they used to do free tip for clean hard-core and tenner a load for buying crushed6t is equivalent. And based on photos looks like front would be faster. I've heard of a few machines locally that will only use back end as they cant or Don't have experience loading lorries with front bucket.
Tracking back and forward all day on a 360 would mean he wouldn't have to get off and do anything else though so he'd be more than happy doing it. Death of the 3cx is more about attitude and work ethic than anything else.Ground workers on a site I was on recently tracking ages to pick up pack of blocks in big 360, then tracking back down. Was taking ages. They mustve had 10 or more big machines on this job, dozer, arctic dumpers the lot. You'd think a backhoe would of fitted in nicely for nipping getting the blocks and jobs like that.
There were 2 telehandler on site but these only for the builder and subbies Ground workers sort all their own kit.
Trouble is not just finding a good op. It's then finding one who wants to be flat out busy all day cos a good man on a backhoe will be kept f'in busy and not many out there who wanna graftThe death of the backhoe is entirely due to lack of ability.... both from labour and operator.
A good man on a 3cx will excel and outpace a 13t machine on general duties around a site switching from pallets, bulk loading and trenching...... Trouble is you need a good man..... and most are crap. One of Facebooks top operators managed to pitch a set of buckets over a fence and onto a OAP..... this to me should result in instant dismissal from the craft yet he's still going.
That's true but that can be applied to almost any trade.Trouble is not just finding a good op. It's then finding one who wants to be flat out busy all day cos a good man on a backhoe will be kept f'in busy and not many out there who wanna graft