Steel Framed Building

Bob

Bob

Well-known member
few pictures of steel building we put up just before I retired or is it just tired We built it labour only
firm supplied everything used his plant, think building came from a firm from Worcestershire
around the 30k but didn't include roller doors
 

Attachments

  • 1306_1024 2.jpg
    1306_1024 2.jpg
    229 KB · Views: 215
  • 1211_1024 2.jpg
    1211_1024 2.jpg
    163.3 KB · Views: 244
  • 1178.jpg
    1178.jpg
    183.6 KB · Views: 223
  • 1174.jpg
    1174.jpg
    198.2 KB · Views: 215
  • 1173 (1).jpg
    1173 (1).jpg
    202.3 KB · Views: 278
D

DaveDCB

Well-known member
My new shed floor took 4 days to polish up! The Last load went off fine in under 8hrs.. all the others were a right bugger up!!
It’s Covered in mud now 🙄
 
M

Monkeybusiness

Well-known member
My new shed floor took 4 days to polish up! The Last load went off fine in under 8hrs.. all the others were a right bugger up!!
It’s Covered in mud now 🙄
The guys who laid it said that the concrete was really good (Breedons - they sourced it, I had no involvement in any of it). They’ve had issues with other suppliers before on bigger pours when the job is located centrally so that the trucks come from different batching plants, and everything goes off at different rates.
 
Richard Hunton

Richard Hunton

Well-known member
Nothing worse than bad concrete, had this off cemex, was an hour to the plant, most of it went in fine.
Because it was a big pour they brought another wagon in from a different plant, he got lost 3 hours later he turned up, wet it up poured it out, the picture was 5 minutes after he left, had to dig it out and bin it off.
 

Attachments

  • 20180926_141401.jpg
    20180926_141401.jpg
    246.3 KB · Views: 210
M

Monkeybusiness

Well-known member
What do you think it will stand you at by the time it's clad and got a lot on @Monkeybusiness
It does look the dogs!
There won’t be much change out of £60k by the time it’s all done and wired up (which is about £20k more than I had in mind when I started thinking about it but I’ve upped the spec every time a decision has needed to be made!). It ‘should’ be worth more than that/add more than that onto my property value though I hope, and it’ll be amazing to have somewhere dry to work on kit at home!
 
Canal Navvy

Canal Navvy

Well-known member
🤑........ close enough to the green eyed monster ;)

That will be a seriously nice fab shop, last time I felt the envy was when the army upgraded theirs to be able to lift off the challenger tops :D
 
doobin

doobin

Well-known member
There won’t be much change out of £60k by the time it’s all done and wired up (which is about £20k more than I had in mind when I started thinking about it but I’ve upped the spec every time a decision has needed to be made!). It ‘should’ be worth more than that/add more than that onto my property value though I hope, and it’ll be amazing to have somewhere dry to work on kit at home!
How did you get it through planning?
 
Top