Ricky Magee and Sons Plant Hire

CPS

CPS

Well-known member
@CPS if the money is right we will sell her.

60-5
year 2000, 9993 hours (will go up as being used)
Blade and long dipper and hyd hitch. Piped for breaker. 450mm pads.
Undercarriage good but does need a top roller. Bit of play in slew ring. Has just started leaking oil around slew ring, spoke to Paddy McIlvar, he says it rotary coupling seals. If we don’t sell her she will be going to him to get fixed. Bit of play in the pins and bushes, not too bad for a 10k hour machine. Have owner her from 5200hours

View attachment 31904View attachment 31905View attachment 31906View attachment 31907View attachment 31908View attachment 31909View attachment 31910View attachment 31911
Send me your number please?😁👍
 
Thomas7740

Thomas7740

Well-known member
3 footer back, should be a good job
ED0CC529-5737-4D76-834E-B1DEDD8C7DD9.jpeg
 
Thomas7740

Thomas7740

Well-known member
Two pits to dig out for filters and ventilation for spray booth. 9 inches concrete and 2 layers mesh to get through, then down a metre for concrete and L bars for shuttering the sides.
Handy day for the 60.
B47456CF-B619-4865-B6A3-4EEDE6230F14.jpeg
E871E0B2-ACB0-40AA-8A42-C564D6181694.jpeg
D19A3F10-5481-41F0-8C62-1183BB96C851.jpeg
 
Thomas7740

Thomas7740

Well-known member
What about a bucket with teeth! 😁
Na, teeth get caught in the mesh and make life difficult, only scraping away and loading wee bits of concrete, no need for teeth
Handy day for a bigger hammer on a bigger machine
It’s not hard on either digger the way it’s being done so what’s your point? Paid per day so if it takes longer so be it 🤷🏻‍♂️ Be different if it was priced but it isn’t
 
GazCro

GazCro

Well-known member
Na, teeth get caught in the mesh and make life difficult, only scraping away and loading wee bits of concrete, no need for teeth

It’s not hard on either digger the way it’s being done so what’s your point? Paid per day so if it takes longer so be it 🤷🏻‍♂️ Be different if it was priced but it isn’t
Those small silenced breakers are frustrating among mesh/rebar as the chisel isn't very long. I get ur paid per day but it's a boring day sitting pecking so I'd personally rather be getting on quicker.
 
Thomas7740

Thomas7740

Well-known member
Forgot the 60 was reaching her milestone, just an hour and a half late getting a photo
471AF519-69D4-4E37-BCA7-335BACB27B9E.jpeg

Big difference using the EZ26 on the breaker, no oil leaks and not needing the bonnet open to stay cool (even with new engine and bigger cored radiator the ex30 ran warm)
EEE58FD3-6F1B-476E-8823-9FBFE412377F.jpeg

7706460A-0262-48A6-A2A2-C3F4919739CF.jpeg
 
Thomas7740

Thomas7740

Well-known member
Have this on hire to dig footings, only got 830mm access 👎🏻 Cracking wee digger, smoothest micro I’ve ever drove, with the smoothness, reach and load over height, it puts the E10 to shame. Not as powerful as an WN803 though. Only thing so far that lets it down imo is the boom doesn’t have enough offset to the left, no complaints elsewhere. Granted it’s about 50-60mm wider than an E10 but generally not an issue from my experience, although I understand everyone works in different areas etc

Only had it 3 days so opinion
C4E95C87-9399-4E03-A083-89FC841E0604.jpeg
6ED74DFA-690E-4CA4-90C3-7B7E24FB549D.jpeg
could change by end of the week 😂
 
Top