Stroppymonkey
Well-known member
New tracksYes , or track stretching if it's old
New tracksYes , or track stretching if it's old
weather's set to be dry for a week ... be nice if the ground dried with itStunning day. Work nice and quiet so just on call to office for decision making, got scalpings scraped out a bit closer to grade, machine returned, and a couple of passes with the wacker plate.
Waiting for some more skips now.
Perhaps start bolting some concrete panels up next week .
View attachment 78367
Big end is 45x60.weather's set to be dry for a week ... be nice if the ground dried with it
what size is your main building Ben .. very jealous and looks well made - decent sized steel in the frame
View attachment 78369
was looking at 45 x 40 for myself, 15ft bays, but with your sort of height eaves - is that a 15 deg pitch?Big end is 45x60.
15ft bays 3 wide x 4 deep.
Waiting for my re mortgage next Easter to release funds for cladding.
Good job I’m not in a rush![]()
12.5 degree pitch I think ?was looking at 45 x 40 for myself, 15ft bays, but with your sort of height eaves - is that a 15 deg pitch?
Why couldn't we have had it last weekweather's set to be dry for a week ... be nice if the ground dried with it
what size is your main building Ben .. very jealous and looks well made - decent sized steel in the frame
View attachment 78369
get some longer, thicker plates Ben - way easier than drilling the damned beams or weld 'em to the columns and galvafroid themHalf day over at the shed site once I caught up with organising the call-outs. Released the bottom section of the C-beams to push it out the way to pop in the first panel. Slipped between the steels nicely so that measurement was good. Misscomm on the position of the threaded inserts for the fixing studs. I’m going to need to through drill them and then pop a plate on the backside as well to pinch in some timber wedges which will pack the gap between end of the concrete panel and the web of the steel.
Getting carried away as I just realised I haven’t grouted the posts in yet🫣
Finished day with a tidy up burn up . Fan assisted!
Surely not? It’s only a 4” panel and I have a variety of SDS drills cordless and corded. I’ll give it a go and see if you are rightget some longer, thicker plates Ben - way easier than drilling the damned beams or weld 'em to the columns and galvafroid them
Done that in the past.weld 'em to the columns and galvafroid them
Edit....get some longer, thicker plates Ben - way easier than drilling the damned beams or weld 'em to the columns and galvafroid them
yes I did realise you were talking about drilling the concrete panels ....Edit....
I plan to drill the panels not the beams....if that makes sense.
Yes I will see how the rest go in.. reckon they could have been an inch longerThe guy who made the steel for my shed supplied it with (and pre-drilled for) heavy angle-iron that fits vertically in the web behind the concrete panels. We used the fish-plates too, but only really for assembly purposes. The angle holds everything rock-solid.
The concrete panels (fitted in the web like yours) were also longer than I’d have personally ordered and I was dubious that we would be able to ‘twist’ them into the posts but they went in pretty easily (we had to remove and subsequently replace the wind-braces to give us enough room on the end bay but otherwise it was simple). I was very impressed with the accuracy of it all - it showed what someone who knows their game and is good with CAD can pull together!
Is that with the panels In the web… and you just poured the web full?On my shed (second hand obviously) after we fitted the (new) panels we then shuttered the webs and concreted them in![]()