Northern Ireland isn’t abig place. With creagh concrete,FP McCann,Loughdoo aggregates, Northstone, and a few other suppliers all having numerous depots dotted around it. We’re very lucky with service. If I’m doing a set of founds i’l ring ahead a day or two in advance with a rough idea of how much I need and pre book first load for approximately 11pm. That will give us time to get a good start made on the digging of it and let building control take a look. We normally work with one lorry on a return. So when u get the lorry in and emptied. You could have Any thing from an hour upwards for him to get back to the plant get another load on and get back to you. So by the time he arrives back to site you have enough pulled out to hold another load. It normally always falls into place. I wouldn’t say I’m well in with the suppliers. But most of the lorry men are owner drivers. So if you work with them they will work with you in return. If you make a decent road in to site that the drivers arnt scraping paint on bushes and pulling wing mirrors off there lorrys. They will be happy And with the concrete pouring bucket once the concrete lorry arrives on site and you start to unload you have him empty in a very quick turn around. Which always helps if your an owner driver.