CPS
Well-known member
Brendan has been know to tidy it up the odd stray with scissorsNo Druid. Block wall built and slap dashed with a leylandi hedge planted behind it. Just kept neatly cut every year. That’s my brothers house.
Brendan has been know to tidy it up the odd stray with scissorsNo Druid. Block wall built and slap dashed with a leylandi hedge planted behind it. Just kept neatly cut every year. That’s my brothers house.
He makes a sweet job with that flailBrendan use scissors? U must be joking. That would be looked at as manual work. And u Havnt got a chance of him doing manual work. This was a while ago but same hedge lol View attachment 67590View attachment 67591View attachment 67592
seriously impressed by the finish he gets with thatBrendan use scissors? U must be joking. That would be looked at as manual work. And u Havnt got a chance of him doing manual work. This was a while ago but same hedge lol View attachment 67590View attachment 67591View attachment 67592
Is the he key to it, little often?Brendan use scissors? U must be joking. That would be looked at as manual work. And u Havnt got a chance of him doing manual work. This was a while ago but same hedge lol View attachment 67590View attachment 67591View attachment 67592
Correct flails and sharp!Is the he key to it, little often?
Nice workA few of the jobs i’v been at in the past few months.
as alwaysNice work
I thought exactly the same, that's dedication and credit where its due. I try to keep things looking tidy but @JimboCX you've got it off to a fine art.Top notch as always! You certainly keep your jobs and equipment tidy![]()
Yeah we always pour the founds as we dig. Just get enough dug out to hold a load and then start digging again once it’s poured. Drop abit of a393 reinforced mesh in at the joint. The key is keeping in good contact with the person on dispatch at the concrete plant.
Good for stopping any collapses too. You must have good contacts and suppliers there. I couldn't see it logistically working here unless you were super well in with the concrete company. Ive had them turn up with big delays between lorries on a single slab before.Yeah we always pour the founds as we dig. Just get enough dug out to hold a load and then start digging again once it’s poured. Drop abit of a393 reinforced mesh in at the joint. The key is keeping in good contact with the person on dispatch at the concrete plant.