timber prices going up again shortly apparently.
yep ,along with every thing else again,and no sign of it stopping.timber prices going up again shortly apparently.
Terrain is different stuff to the domestic pvc stuff, v expensive! Although it’s all silly money these days!
Is that a key board error??for the big 21m+ overhead £400 till jobs done. no reason for it to take long as the time limiting factor is supply of wagons, it empties them fast!
Most we done in a day is 71 wagons non stop, site was 4 miles from breedons batching plant which helped.
price is labour only with plus materialsTerrain is different stuff to the domestic pvc stuff, v expensive! Although it’s all silly money these days!
don’t know if anyone else is struggling to quote for jobs on fixed prices , everything is going up between quotes and invoicing!!![]()
Mate was telling me yesterday steel quotes are valid for 1 day only atm.Terrain is different stuff to the domestic pvc stuff, v expensive! Although it’s all silly money these days!
don’t know if anyone else is struggling to quote for jobs on fixed prices , everything is going up between quotes and invoicing!!![]()
More likely to be 8m3 loads.. 568m3!! I’ve done some huge footings in the past, but never that much in one day, mostly because it’s alot to dig/pump out when it rains and falls in![]()
can remember @Giles doing some really big floors a while ago ..... were on the CEFIs that a key board error??
71 lorry loads!!! 426m3 is one hell of a footing!!
Terrain is different stuff to the domestic pvc stuff, v expensive! Although it’s all silly money these days!
don’t know if anyone else is struggling to quote for jobs on fixed prices , everything is going up between quotes and invoicing!!![]()
back in '07 steel was going up every couple of days ... I was quoting work with a week's validity on material costsMate was telling me yesterday steel quotes are valid for 1 day only atm.
Is that a key board error??
71 lorry loads!!! 426m3 is one hell of a footing!!
When it pops it’s going to really popyep ,along with every thing else again,and no sign of it stopping.
back in '07 steel was going up every couple of days ... I was quoting work with a week's validity on material costs
had a quote from a stockholder I used to use last week for 4.5t of stuff ... some for a couple of things I have lined up and some for 'stock' ... no validity dates on it, but I'll bet I need to get it ordered sooner rather than later![]()
bargain,there 2 to 300 quids worth thereView attachment 32090
Just raided off cut pile at local stocky...£100 all in...didn't think was bad but...I don't buy much was I taken for a ride?
get the bathroom scales out and weigh it .... when you get over 80kgs you'm on a winnerView attachment 32090
Just raided off cut pile at local stocky...£100 all in...didn't think was bad but...I don't buy much was I taken for a ride?
the 50 x 50 x 3 is £4.95/M ... not far off the right sort of level paid I'd say if that's a 4' x 3' pallet, but on the right side for LL .... circa 12m of 50 x 50 x 3 SHS there - 55-60 quid .... the PDF I attached above'll give people a pretty fair idea on figures £1090/t averaged across sections/flats/angles/hollow sections ..... pretty fair prices from Roger, TBFbargain,there 2 to 300 quids worth there
Was 100kg exactly...loaded the scales mysell.get the bathroom scales out and weigh it .... when you get over 80kgs you'm on a winner![]()
weren't robbed fella -- £833/t +VAT .... that PDF above is also plus VATWas 100kg exactly...loaded the scales mysell.
Quid a kilo Inc vat
Looks good deal to meView attachment 32090
Just raided off cut pile at local stocky...£100 all in...didn't think was bad but...I don't buy much was I taken for a ride?