Good morning,
We have a problem at work at the moment.
We have a drain run heading through one of our units at work on a project we have taken over.
Pre handover we have had CCTV surveys completed and their is a 20mm sag in the pipe.
We need to relay 11metres of 225mm at 2metre deep through the unit and we have the width, but only 2m clearance height to get in through the doors.
Was looking to potentially block the unit off and use positive pressure to potentially get the fumes etc out.
What advice does everyone have?
We really need to find something bigger than a ton and a half to become efficient for the job.
Any advice would be most welcome.
Many thanks.
Matthew
We have a problem at work at the moment.
We have a drain run heading through one of our units at work on a project we have taken over.
Pre handover we have had CCTV surveys completed and their is a 20mm sag in the pipe.
We need to relay 11metres of 225mm at 2metre deep through the unit and we have the width, but only 2m clearance height to get in through the doors.
Was looking to potentially block the unit off and use positive pressure to potentially get the fumes etc out.
What advice does everyone have?
We really need to find something bigger than a ton and a half to become efficient for the job.
Any advice would be most welcome.