Furniss
Well-known member
Seems more economical overall in good weather to go to the plant for a bit of lean mix but going into winter and rainy days it gets harder to time the trip to the plant, Im wondering if with some creative thinking utilizing the engcon there is a way to mix up a bit of lean mix holeside, the spec on many jobs is just stabilized sand at 200kg per m3 ?