doobin
Well-known member
What does everyone find the easiest method? Normally we'd shutter the sides and just pour and tamp, but this slab is something like 8m x 10m. I'm thinking I'll need some kind of screed rail in the middle, plus something better than a straight ish length of 2x4 to level. I have plastic screed chairs, but not sure they'd be strong enough? Is there some kind of screed chair you can get that sits on some rebar you knock into the ground? Have plenty of space each side of the form to pull a scaffold pole out as we go.
Also, does anyone use one of those Honda powerfloat things? Are they worth it?
Also, does anyone use one of those Honda powerfloat things? Are they worth it?