Finished drive job on Tuesday
And put a couple of gate posts in for the paddock on the right they will be setting some fence a meter back from road eventually
Started on Wednesday another campsite 3rd one this year
Got loads of cables , services and drains to do plus four hard standings for seasonal staff as to they are losing 5k a year per pitch on the main campsite so we are putting them up in the caravan storage/dog walking field
Got the electric cable from main supply shed to where we pick up the drain and water yesterday while going over the main 3 phase supply in and under the feed from the solar panels
Got the new manhole in and started digging a nice and neat trench then bam bloody big rock before we even got the first length of 110mm pipe in and there goes my tidy trench