D
DaveDCB
Well-known member
You dig the hole as spec’d by the customer, then go home. Simple.
If I can make life easier/cheaper for me and still get the same result for the customer I try to do it.You dig the hole as spec’d by the customer, then go home. Simple.
Often I find it's because someone has letters after their name and specifies a square meterage of concrete. Yet even with said letters after their name, they can't use pi.
Definitely 4 sides to itTwo sides to it.
You will likely find there is a spec from a sporting body going back decades that factors a square hole that has never been improved upon. Auger would be cleaner, quicker and simpler but the aggro changing the spec is not worth it.
I personally would auger the centre and graft down the sides..... Just my penneth.
ive done our rugby club ones with our 300mm augerI'm not criticising either but tbh the only load a rugby post or flagpole needs to resist is falling over unlike for example a column for a building which may also need to factor in wind lifting it under a roof. You'd think even a 300mm auger hole but deep would be easier and better.
I've seen that before somewhereMade this years ago for doing post holes digs a perfectly square hole View attachment 29190View attachment 29189
Would the square hole be less likely to move in the ground/ large flat surface against the ground rather than a rounded one. To get the same side ways force the round hole would have to be substantially bigger?I appreciate that, but I was more interested if there was a technical reason square was better? The guy I know owns no plant of his own, but if it works out for him he will have a lot of flagpoles to erect so we were discussing the easiest way of doing it, then this comes up in a thread, so picking the forums brains, not criticising Ollie.
I was impressed with your square hole but only because I thought you had done it with the non engcon equipped diggerI have no idea why they want a square hole, I don't ask, I just dig. Its likely to come from some sports England spec somewhere. And yes I dig them with the machine. Why would I take an auger along as well and then get the shovel out to square it up? Come on Rory!
The socket I have to install is only 600mm long so not the biggest thing and they want it just below the grass so the mower will pass over it. Its a two day affair where the first day you set out, dig and put the sockets in place with some post mix to hold them in the right place. The 2nd day you pour concrete, topsoil and reinstate the grass. A home by 12 kind of affair. Cant complain. Ill take more pictures next time of the process - I didn't realise of all the work I do, this would be the most interesting!![]()
Augers are a frickin nightmare it has to be said- I've lost count of the gas line/bT lines and water pipes I've gone through with mine- all in areas where you'd never suspect it to be!
No doubt mate, and it was nice pretending I was a big time contractor for a few weeks while I had them. If the bigger work paid as well as the smaller stuff then I would run a similar setup.@Gunners Thinking that 8 Ton JCB and dumper you've had would look quite smart with Gunns Contractors on the side of them mate. Fit in Quite Nicely with your 8026 and dumper.
Small is beautiful mate.No doubt mate, and it was nice pretending I was a big time contractor for a few weeks while I had them. If the bigger work paid as well as the smaller stuff then I would run a similar setup.