E80 Bobcat King post re-bush costs

pettsy

pettsy

Well-known member
Wouldn't think most line boring kit would do pins that small. Any local machine shop could have done it no bother.
yer most seem to go down to 22mm, how would a machine shop do the frame?

mine was worn in the frame as the pin locating bolt was missing. Was easier and cheaper to cut the old boss off, a local machine shop made me a replacement and a mate welded it on.

A41E3D55-C654-4CEA-8145-F8E13221589C.jpeg
 
CPS

CPS

Well-known member
Where abouts are you Kev? @CPS Aiden does a lot of this sort of stuff
Thanks Ollie, haven't done much of this sort of work in a while, don't do any out side work now.... only what we sell.

I have done a few doosans before and I'm pretty sure from memory that the main pivot pin is bushed in both the king post and the main frame, but for some stupid reason not on both pins. So in short you will most likely need to bore the king post and frame, so will need someone mobile.

I'd budget about £2-2.5k depending on condition and how far the guy has to travel etc.
Also worth pointing out, Those machines have a weak point in the main frame where they rip out the top boss if real bad. Can be repaired... but needs to be done right.

Hope this helps.
 
craig

craig

Well-known member
I seem to remember reading posts (here or the old forum) someone set up to do line boring, mobile, I think there was pictures of his work, possibly some of work on a steam engine?
Anyone else remember?
 
  • Like
Reactions: Kev
Mogman

Mogman

What man as done, man can do, what never has,maybe
I seem to remember reading posts (here or the old forum) someone set up to do line boring, mobile, I think there was pictures of his work, possibly some of work on a steam engine?
Anyone else remember?
Yes the guy lives not far from me in Cheshire
can’t remember his name though
 
pettsy

pettsy

Well-known member
I seem to remember reading posts (here or the old forum) someone set up to do line boring, mobile, I think there was pictures of his work, possibly some of work on a steam engine?
Anyone else remember?

I searched the “old” forum but couldn’t find anything, didn’t realise it was on here:rolleyes::LOL:
 
  • Like
Reactions: Kev
T whiting

T whiting

Well-known member
yer most seem to go down to 22mm, how would a machine shop do the frame?
Get the whole upper half on a decent mill 😉

You can do it yourself with a welder, a die grinder and a lot of patience if there no too bad
 
  • Like
Reactions: Kev
Mark

Mark

Well-known member
We done ours a while back, can’t remember exact cost’s but parts were very reasonable, you can go to bobcat or doosan as the dx80 is the exact same machine.
 
  • Like
Reactions: Kev
Kev

Kev

Member
Thanks Ollie, haven't done much of this sort of work in a while, don't do any out side work now.... only what we sell.

I have done a few doosans before and I'm pretty sure from memory that the main pivot pin is bushed in both the king post and the main frame, but for some stupid reason not on both pins. So in short you will most likely need to bore the king post and frame, so will need someone mobile.

I'd budget about £2-2.5k depending on condition and how far the guy has to travel etc.
Also worth pointing out, Those machines have a weak point in the main frame where they rip out the top boss if real bad. Can be repaired... but needs to be done right.

Hope this helps.
Thanks for the info.
 
L

Lynchy

Well-known member
Darren marsh,based Colchester way,top class machinist,portable machining svs LTD,also does workshop stuff to high standard,
01206 272796
 
L

Line Boring Guy

New member
I seem to remember reading posts (here or the old forum) someone set up to do line boring, mobile, I think there was pictures of his work, possibly some of work on a steam engine?
Anyone else remember?
Where in the U.K. are you matey - I have a friend who used to go on site line boring on behalf of JCB - he is now set up to do it himself. He can bore pin holes between 50 and 200 mm. He will cover U.K. mainland sites. His name is Gary on 07792 252422 should you require line boring on site service.
 
Top